A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
Sign In
Forgot your password?
Or sign in with...
Level 1 Washing Basin Area
October 3, 201214 yr
For reconstruction, my experience, during the initial design development stage, you must have a good architect and structural engineer. These 2 must really be on the ball, to come out with approved dr
Before
After
Temp site office under the stairs
MBR Toilet Cubicle Set up
The Main Gate is UP!
Edited May 10, 201610 yr by mysweetlittlethings
Main Gate
Water Feature
Mock-up of Railings
Main Gate (view from staircase landing)
Side entrance void
Installation of rear gate
Side view of house (level 1)
Installation of Side Gate
Search
Create an account or sign in to comment