Hey Experts

I planning (well in advance) for my renovation next year for a resale HDB 3room unit.

Scope :
1. Hacking of floor/cabinets/false ceiling or walls (if any) - literally whole hse

2. Flooring material for 2 bedrooms + Living room (let's say 550sqft) - Granite

3. Carpentry - Kitchen cabinet with Quartz top (approx 2.1m run)

4. Carpentry - 3 x bay window (with cabinet - total run 9m approx with 60-80cm height)

4. Electrical Recabling of electrical wires(whole hse), installation of instant water heater x 2 (OPTIONAL)

5. Hack/Relay/waterproof x 2 bathroom

6. Misc incl haulage, chemical clean, etc

 

Attached is a floorplan i stole online LOL

Is $30k Enuf? Exclude new sinks/wc/appliances/lights/fans/painting etc.

 

Thanks a mil!

OrchidSpring3rm FP.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

hacking = ?
granite flooring assuming 600 x 600 sized at $20psf (including laying) will cost you $11K

quartz countertop would cost you about 1K

kitchen cabinet (bottom part) for quartz countertop at $120 per foot run will cost you about $840 for 7 foot (2.1m)

bay window cabinets at $120 per foot run will cost you $3600 for 30 foot (9 m)

electrical = ?

2 x toilets at $5K per toilet will cost you $10K

add up all above estimated costs already more than 26K. so your 30K budget is definitely not enough.

 
  • Like 1

Share this post


Link to post
Share on other sites

Ooooh  wah, one toilet $5k so expensive hmmmm maybe i should only rework the master bedroom toilet, or maybe dun even rework any toilet, just clean it up.

 

Share this post


Link to post
Share on other sites

By the way, isit possible to request for payment terms like this ?

Downpayment - 15%

Milestones

Completion of Hacking - 5%

Start of tiling/flooring - 10%

Completion of tiling/flooring - 20%

Start of Carpentry - 5%

Completion of Carpentry - 15%

Completion of Electrical works - 10%

Completion of Project (all above done + chemical cleaning + punch list (rectifications)) - 20%

 

 

 

 

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×