Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Leaderboard


Popular Content

Showing content with the highest reputation on 09/30/2014 in all areas

  1. 1 point
    #Aplaceofourown First time posting my t-blog. Sharing my story of my first house. So here is my 4room floor plan. Mine is a resale flat of 92 square m. This is what I intend to do. - 2 wardrobe, one for master bedroom and one for bedroom 3 - redo the two toilet - redo the cupboard in the kitchen - Brick wall in the living room After much searching for a ID, I finally settle down with one. So my renovating journey begins! I started right after the chinese 8th month (3sept?) and the ID said that he can give me ard the 17Oct. Fingers crossed! =)
  2. 1 point
    Hi evryone, I just got a quotation from an interior designer and the total package quoted to me was $20,466.49. This exculdes the electrical works. Is the quote ok? Got a few other quotations that are like $35k, $26k and this was the cheapest. They are a small company and not so renowned, but the ID was efficent in sending me my amended quotes. Going to meet her this sunday and will update everyone here. Water Terrace II 5rm BTO Premium Punggol Flat 1 Consultation & Design Proposal2 Space Planning & 3D Computerized Perspective Drawing3 Product & Material Proposal4 On-Site Supervision & Project Management5 Haulage of Materials, supply Cement & Sand ( By HDB Approved Contractor )6 Transport to Clear & Disposed of Debris ( By HDB Approved Contractor ) MASONRY WORKS1 Showet kerb for 2 toilets complete with tiles finished2 To supply & construct kitchen cabinet base complete with matching HDB tiles3 To supply & construct fridge base complete with matching HDB tiles.4 To supply & construct washing machine base complete with matching HDB tiles. PLUMBING WORKS1 To supply & lay conceal drainage piping for kitchen sink.2 Extension of copper piping for kitchen sink3 To supply Material & labour to install 2 nos. of instant heater or 1 no. of storage heater4 To supply Material & labour to install 2 set of bathroom accessories.5 To supply Material & labour to install 2 nos. of mirror6 To supply Material & labour to install kitchen sink & tap. PAINTING WORKSTo supply & paint whole unit wall & ceiling with Nippon/ICI emulsion paint. Max 5 paints CEILING WORKS1 To supply & install Flase Ceiling at foyer & dining area2 To supply & install Flase Ceiling at bedroom passage way3 To supply & install L-Box **** area CARPENTRY WORKS1 To design & fabricate 24ft kitchen cabinet using solid plywood in laminated finish (14ft top & 10 ft bottom) a.Postfoam kitchen worktop.b.Designer handle.c.2 tier stainless steel dish rack.d.Cutlery tray.e.Supply & install white solid top surface at kitchen's cabinet table top area with backsplash 10ft 2 Design & fabricate T.V Console **** 6 ft 3 Deisgn & fabricate feature wall for living room 6ft4 Full height swing door wardrobe for master bedroom (L Shape or walk - in wardrobe)12 ft5 Deisgn & fabricate full height glass display unit **** room 3 ft6 Vanity cabinet top for masterbedroom and common toilet 2nos MISCELLANEOUS WORKS1 Chemical washing upon completion of work.2 Laying of protection sheet upon completion of flooring works.3 HDB permit Handling Fees Additional Item1 Tempered glass shower screen w/ door for master toilet ( wall to wall ) for master bedroom2 Tempered glass shower screen w/ door for common toilet ( L-shape, sliding ) for common toilet3 Install aluminium sliding grilles for service yard4 Install windows for Service yard5 To supply & install Brick Wall design wall at foyer/entrance to block the view of the living area6 To construct and build a kitchen door entrance ( L-shape, with the wall facing the living room to be top half glass tempered screen and bottom half hollow wall)
  3. 1 point
    Another round of Taobao, though 90% of the items are not mine.
  4. 1 point
    Last day before the move... Washer and fridge delivery - checked Citygas turn on - checked My republic activation - checked Yay! I am done except the packing (-____-)zzz Spent almost the whole day in the new house repacking the unused tiles into the water and gas storage area outside the house...and clearing the cow webs that has accumulated for the past 6 years! Ok my mum insisted that I bring over this rug that she made from old towels... The pooh found its home in my kitchen now...
  5. 1 point
    Finally my last shipment from TB. A total of 15 parcels!
  6. 1 point
  7. 1 point
    Had installed the fan last 2 weeks.. Good service by Eric! Thumbs up! Will get from him again..
  8. 1 point
    Your sofa looks nice. Where did you custom made it?
  9. 1 point
    So far the cheapest I have found is $1100; additional $200 for the LED light. Bamboo is $1300. My friend and I are looking to install Haiku too. I am considering to organise a group buy
  10. 1 point
    Granite top measurement done today. The guys took out my rinnai cooker hob for measurement... I love the hob. Very classy look. With the black tempered glass matching my black touch screen hood. But after installation, I don't seemed to be able to switch it on for a test.. Dunno if it is an installation problem or the electrician problem... #feelingsian #whykeepgoingwrong #canihaveasmoothreno?
  11. 1 point
    The toilet floors for both toilets are up today. We opted for a drop-down at the shower area, instead of a kerb and I thought it turned out really nice.
  12. 1 point
    HI, can pm me the contact and name? Thanks.
This leaderboard is set to Singapore/GMT+08:00

×