These are what I intend to do, but subjected to minor changes.
DEMOLITION WORKS
To provide labour to do chipping at access balcony.
To provide labour to demolish existing floor tiles ****,dining room & balcony.
To provide labour to demolish existing skirting ****,dining, study room & balcony.
(Include plaster smooth affected area)
To provide labour to demolish existing floor tiles at kitchen & 3 bathrooms.
To provide labour to demolish existing wall tiles at kitchen, bathrooms 1 & 2.
To provide labour to dismantle 1 set of existing wardrobe at master bedroom.
To provide labour to dismantle 1 set of existing kitchen cabinet.
To provide labour to dismantle existing wires & lightings at kitchen & 3 bathrooms.
To provide labour to dismantle all existing sanitary wares at kitchen & 3 bathrooms.
To provide labour to dismantle all existing ceiling work for whole house.
To provide labour to demolish existing 1 panel of half-height wall with windows between
study room & access balcony.
To provide labour to hack existing round arch to square edge for all doors.
To provide haulage services. (Loading of goods & materials)
To clear & disposal of renovation debris.
To supply & over-lay white pebbles with black polished homogenous steps at centre at
access balcony.
To supply & lay 600 by 600mm, polished, super gloss, anti stain, imported
homogeneous floor tiles ****, dining room & balcony.
To supply & lay 600 by 600mm, polished, super gloss, anti stain, imported
homogeneous skirting ****,dining room & balcony.
To supply & over-lay HDF laminate floor with skirting at study room.
To supply & lay 300 by 300mm, matt, non-slip, imported homogeneous floor tiles at
kitchen & 3 bathrooms.
To supply & lay 300 by 450mm, polished, imported ceramic wall tiles at kitchen, bath-
rooms 1 & 2. - 2 tones & up to ceiling height
To supply & lay 2 layers of quic-seal 104 water proofing membrane at kitchen & 3
bathrooms. (HDB approved water proofing membrane)
To supply & lay 1 layer of 3 in 1 water proofing cement screed at kitchen & 3 bathrooms.
To raise up 1 no. of 50mm fridge & washing machine base with tiles finished at kitchen.
To raise up 4 nos. of 50mm door kerbs with tiles finished at entrance of 3 bathrooms &
kitchen.
To raise up 2 nos. of 50mm shower kerbs with tiles finished at bathrooms 1 & 2.
To supply & over-lay white pebbles with cement at entrance of bathrooms 1 & 2.
To plaster smooth affected areas after demolished of walls at 3 bedrooms & study room.
To provide labour to grind & varnish existing parquet flooring at 3 bedrooms & passageway.
To provide labour to grind & varnish existing parquet flooring at steps to level 2.
PLUMBING WORKS
To supply & install stainless steel pipes for whole unit. (Cold points only)
To supply & install inlet/outlet pipes for sink, washing machine & 3 nos. of wash basins.
To provide labour to install 1 no. of sink at kitchen.
To provide labour to install 3 nos. of wash basins at 3 bathrooms.
To provide labour to install 3 nos. of sitting toilet bowls at 3 bathrooms.
To provide labour to install 3 nos. of instant water heaters at 3 bathrooms.
To provide labour to install taps & bathroom accessories at 3 bathrooms.
ELECTRICAL WORKS (Exclude applying of PUB testing)
To re-run existing wiring at kitchen & 3 bathrooms.
To run wiring & install 30 nos. of lightings points.
CEILING WORKS
To supply & construct light pelmet & false ceiling **** & dining room.
To supply & construct false ceiling at master bedroom.
DOORS / GATE / WINDOW GRILLES / SHOWER SCREENS / ROLLER SHUTTLE
To supply & install 3 nos. of 3 by 7 feet veneer doors with locksets at 3 bedrooms.
To supply & install 2 nos. of 3 by 7 feet aluminium belglass doors at bathrooms 2 & 3.
To supply & install 1 no. of 3 by 7 feet 10mm tempered clear glass swing door with handles
at bathroom 1.
To supply & install 1 no. of two-leaves solid nyatoh doors at storeroom.
To supply & install 1 no. of 4 by 7 feet veneer main door with lockset & long handles.
To supply & install 1 set of aluminium bi-fold doors with clear glass at balcony.
To supply & install 1 no. of 4 by 7 feet design wrought iron main gate. (3 panels)
To supply & install aluminium bronze/silver sliding window grilles ****, dining, balcony,
access balcony & 3 bedrooms.
To supply & install 1 set of wall to wall 10mm tempered clear glass shower screen at bath-
room 2. (1 fixed & 1 swing panel)
To supply & install 1 set of L-shaped 10mm tempered clear glass shower screen at bath-
room 1. (1 fixed & 1 swing panel)
To supply & install atuomated roller shuttle at balcony.
CARPENTRY WORKS
Access Balcony
To design & fabricate 2 sets of 10 feet suspended bottom shoes cabinet c/w solid plywood,
& laminate finished.
Living & Dining Rooms
To supply & construct 1 panel of 6 feet by full-height partition wall for TV area.
To supply & install 2 pcs. of 4 feet wooden shelvings at partition wall for TV area.
To design & fabricate 1 set of 5 feet bottom altar.
Study Room
To design & fabricate 11 feet full height storage cabinet c/w solid plywood, sliding doors
& laminate finished. ($210 pfr)
Bedrooms
To design & fabricate 9 feet full height sliding wardrobe with glass & mirror c/w solid plywood
& laminate finished at master bedroom.
To design & fabricate 7 feet full height sliding wardrobe c/w solid plywood & laminate
finished at bedroom 2.
To design & fabricate 9 feet full height sliding wardrobe c/w solid plywood & laminate
finished at bedroom 3.
Kitchen
To design & fabricate 35 feet top & bottom kitchen cabinet c/w solid plywood & laminate
finished.
ABS trimmings
Design handles
1 chest of 4 sliding drawers
2 panels of sand-blasted glass doors
1 no. of 2 tier stainless steel dish rack
To supply & install 15 feet L-shaped solid surface worktop.
To provide labour to install 1 set of cooker hood & hob.
Bathrooms
To design & fabricate 4 feet suspended bottom vanity cabinet at bathroom 1.
To design & fabricate 5 feet suspended bottom vanity cabinet at bathroom 2.
GENERAL WORKS
To furnish whole unit wall & ceiling with ICI or Nippon pentalite emulsion paint. (Up to 5
colours)
Ceiling white colour.
3 coats with 1 white base coat & 2 colour coats.
Include painting of all pipes, doors & door frames with gloss finish paint.
To furnish oil base or water base sealant. (Depend on existing wall condition)
HDB permit submission.
To provide chemical washing & general cleaning for whole unit upon completion. ( x 2 )
To supply & lay paper roll protection on homogeneous floor tiles at level 1.
To supply & install 1 no. of stainless steel flat-faced rubbish chute hopper at kitchen.
Hehe...I wish to have...but I intend to have a play area for my kids too...so i will use the space on the balcony
Yah...I was shocked when he told me 34k. That is why i printed a whole list for him to quote me. Hehe...if it's really 34k, I may add more things