Everything posted by steelze
-
Sims Drive 5i
Bedroom 3 Bedroom 2 slanted wall resulted which id used a "set-off" adjustment piece for my laminate flooring Masterbed room Studyroom
-
Sims Drive 5i
actual layout is like that: ____________________ ---------------------------- Wall A (newly erected) ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||wall b (hdb)..............||Wall C (hdb) ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||...............................|| ||-------------------------|| ||__________________|| ||-------------------------|| wall d (hdb) ugly non-uniform laminate is visible along wall a and wall d.
-
Sims Drive 5i
but if slanted, wont the laminate look ugly like not uniform de?
-
Sims Drive 5i
the laminate flooring... the last panel to the wall is not parallel. run s gradually from big to small... Newly erected wall Opposite window wall both ends were not straight as can see from the laminate panels...
-
Sims Drive 5i
Today i found out that one of my common room wall is slanted terribly. only realised this after the laminate flooring was done. worse thing is the that the slanted wall is a newly erected wall.! id still said it's my house slant. wth... i am speechless la...
-
Sims Drive 5i
thanks all for the advice. probably i am too stress over this period, and id happens to be the anger venting point for me. i'll give him some space.
-
Sims Drive 5i
Week 6 Window grilles done up. 2 thumbs up for Alex and team. Did a great job. My wife like the white horizontal grilles a lot. doesn't look jail feeling to us. heng... He even helped me to patch up the scratches on the WPC windows cased by the stupid ID's workers. Thanks! Yet again, ID's promise was an empty one. Laminate flooring still left skirting undone. Last week he said he will chiong Monday and Tuesday to complete the flooring which suppose to be done in week 5. Tmr is Thursday already. Called him. He said tmr no workers. Friday will finish. he keeps playing such delaying games... it's so hard for me to plan my leave to visit the jobsite. tulan told him the kitchen entrance still unresolved. he said install glass door first. gap will be rectified in later stage. steady lor.. everything push to later later... my last payment also later liao...
-
We Live Love Laugh
i show my wife first. she will be the one using and refilling it. haha.. if she ok, i dun mind group buy. but prob i will just drive down to buy it off the shelf next weekend if i got the time.
-
We Live Love Laugh
gooooood! chiong ah~ hehe. how to mount on wall tile? 3M hook? or nail it dead? haha.. i noob in such stuff.
-
3-room Resale In The West
I found the cheapest source for bi-fld door. Tech Guan (Mr Choo) - $150 per set (bottom track one) I am still looking for Shower Screen set. He quoted $420. looks good, but i believe there is below $400 one out there... =)
-
We Live Love Laugh
online purchase need total purchase of more than $200 to waive the $15 delivery charge. Hmm.. if i go down to their office at pandan loop, can we buy directly off the shelf from them at $30 too?
-
Sims Drive 5i
waa... marshmallow, u always have the same answer as my id!! hahaha.. he said mine is polished glossy homo tiles. tt's why cannot use chemcial wash. only general wash for living room and bedrooms with laminate flooring. as for the kitchen door, i will ask Mr Choo come down and measure again see if he is ok with that 5 to 7mm gap. 2 more weeks to handover. but how come i still dun feel it... my place still a big mess all over. packet drinks from last week are still lying ard. carpentry measured, but yet to install. lighting, wc, sinks all not done yet. siao liao...
-
Sims Drive 5i
Earlier glass man told me that kitchen entrance measurement not accurate. bottom opening is 1/2 inches (10mm to 12mm) more than top opening. He said not accurate, glass door will have visible line gap at the lower portion than the upper portion. ID said he will recitify it. I re-measure it again, still different of 5mm to 8mm. I hope this can be acceptable. why so suay... got such problem... haizzzz i am using an older picture (2 weeks ago) to illustrate the measurement.
-
What Is Acid Wash?
my id told me chemcial wash is only for kitchen and bathrooms flooring. living room homo tiles and bedroom no need. ??? True?
-
Sims Drive 5i
yea... but the chemcial wash ($180) is FOC for me liao. but i will ask for chemcial wash for my living room bah... i see so many rubbish around, buay tahan already.
-
Sims Drive 5i
Chemical Wash ID told me chemical wash is only for kitchen and both bathrooms floor tiles. Living room and bedrooms no need. zhun bor? But my quotation he stated chemcial wash for house house flooring. Bros out there, pls advise.
-
Sims Drive 5i
heyy marshmallow, thanks for the explanation. anyway, the colour on the wall look ok, i will just move on bah... i guess many ppl will have this misunderstanding. haha.. think next time my ID will inform his customers first, if not kena AK47 from them. Kitchen Entrance today glass company (Teck Guan, Mr Choo) came down to measure my kitchen glass swing door. He called me and gave me a shocking news! Mr Choo: "Why your kitchen door opening not straight one? You asked cheap contractors to do ah? The top opening is more than 1/2 inches wide than the bottom openning. If i install the glass door, u will see bigger gap along the upper glass door than the lower side. very ugly one." Although i didn't see it for myself, i roughly know what he meant. Called up my id again to inform him about this. ID: "It's NORMAL for HDB wall. Because kitchen floor is slanted due to water level, and wall structure is not levelled......." Me: "Waiit!! But this kitchen wall is newly built up by ur worker using hollow blocks. The uneveness should be accounted for when u guys build the wall mah." HDB floor slanted, ur wall must also slant meh? arghz... Anyway, i am glad that he has asked his worker to rectify it now. Tmr will be resolved... hopefully...
-
Sims Drive 5i
Week 6 Haiz.. saw few things that bothered me when i went down to see the progress earlier. Painting I saw my supposed ICI Emulsion paint were actually from metal tins that don't carry any ICI logo or name or brand. WTH? Are they using pirated paint that just simply matched my ICI colour codes? I called my ID (Eric) for explanation. He said they were indeed ICI paint. Just that the painter company will normally purchase paint in big bulk. Then they will pour the selected colours into smaller metal tins to client's job site. he continued to add that it's very NORMAL for renovation to mix paint with water. Because if painter use pure paint only, it will be too thick. So? Thick thick la? Wadever it is, what can i do? Ask him for proof? Re-paint everything? This will only delay my hand-over date. L L suck thumb... Masterbed room half height false wall at bed head I topped up $180 for a half height partition false wall to be used as my bed head as my bed frame doesn't have head board. Secondly, the above ceiling has a beam and i am superstitious that it's no good to sleep under the beam. i EXPLAINED that to the id that i want a false wall as thick as the beam (about 8 inches). Today i saw the false wall. WTH? it's only 4 inches. I called him to explain. His response: "Waaa? You never tell me earlier? Anyway, NORMAL partition wall is 4 inches only. if you want 8 inches, have to top up another $120..." Although $120 is ok, but i felt cheated because i TOLD him i want a partition wall to be as thick as the beam of 8 inches! We don't see people selling right shoe, then ask u top up for left shoe right? If at the start he told me that the total false wall is $300, i may give a consideration whether to proceed or not. Now i stuck in a situation that i have to top-up. Rubbish and urine/poo smell I have complained to him abt the rubbish at my place 4 times (almost every week). Workers just threw their cigarette butts, can drinks and rubbish all over the living room. Why CANNOT just consolidate all rubbish at one corner and put them into thrash bag? WTH. Both bathrooms are abused the most. Strong stints of urine and poo are there no matter how many times i spray the air freshener. Last Sat after the chemical wash, everything was fine. But today they abused them again. The smell was back! these barbarians simply dun know how to respect people house. ID's favourite excuse is that this is very NORMAL for all renovation to experience these nature calls problem. WTH, my twin brother is currently doing renovation the same time as me and i DON'T see /smell any rubbish or urine /poo every time when i visit his place. I am really super tired to complain things to him every 2 to 3 nights. I really don't enjoy calling him to complain at all. Additionally, i need to manage my own busy work and a new born at home. Hope all this will end soon. Carpentry yet to start. I foresee h.e.L.L. awaits me.
-
Revamp Of A 40yo 3rm Pigeonhole...
heyy neubie, really thankful for the detail network diagram. ur T-Blog is more like a IT-Blog now.. haha.. cause u really guru in this geeky stuff. i realised i need to install the opennet termination point and ONT before my carpentry work for tv console and feature wall is installed right? can i do it another way round. install carpentry work, then opennet stuff? yet can be conceal in console /feature wall.
-
Hougang 5i In June
waa... sgnick, u really gave a lot of businesses to vincent and william! haha.. they lucky to have you as their client. gotta admit that their carpentry quotes are unbeatable. hehe... hope they wont raise their pricing because of good business. i may wanna look for them to do some minor carpentry work in future!
-
3-room Resale In The West
*clap clap clap* nice industrial WIW you guys have came up with. wow, u really support ikea a lot! anyway, I called SJ yesterday. the boss, James spoke to me. asked him for my requirement on: 1. Glass swing door for kitchen (10mm, tempered glass) - $480 2. Sliding glass shower screen - $1200 hmmm... a bit high for me.
-
Sims Drive 5i
Week 5 (weekend work) painter indeed came down today to start the painting of base coat and some minor cement patching over holes and nail scars. id said painting work will be completed by tmr sunday, so that my pergo laminate flooring can be done on monday. follow by lighting points, 2nd stage plumbing work and carpentry. Living room - Joining between L-box and False Ceiling (foyer area) Foyer area - Box up pipe at corner Common bedroom 2 - False ceiling and L-box Masterbed room - L-box and false ceiling
-
Sims Drive 5i
hi amyznl, congrats on ur new flat. so far still ok. he has been accommodating. but schedule is a bit delayed here n there. the main reno is managed by the id. you can refer to one of my previous post for the quote. as for the rest, i self sourced windows, electrician, doors, glass work and air-con. cost difference is a lot definitely. because when id /contractor quote u items, they sure have to mark up mah. unless he is very kind person, or he is ur relative, or he already makan u full full in some other items... also depend on ur budget. if 50k to 70k is ok for you, then might as well let one id /contractor run all the show. save ur time and efforts. my budget is 35k, so have to squeeze tight for every penny spent. but self source is very time consuming as you need to manage their installation dates to be in line with the main id /contractor schedule. if the id /contractor delay like my case, i need to call all of them to re-arrange time again. even more tough if u have to work during office hours.
-
Sims Drive 5i
Week 5 (Ended) Ceiling work all done up. Look really good. But generally this is another delayed week. Painting supposed to be done last Friday. Till now painting, laminate flooring for bedrooms, tiles for storeroom still not done up yet. Asked ID why ah, he said manpower issue, but will not affect schedule.... he said his workers will chiong for me over this holiday weekend. tmr is January le. 17 more days to hand-over date, but carpentry yet to start... sianz.... worried...
-
3-room Resale In The West
bro, i dun see googled result of sj glass!!! i need to comfirm my shower screen liao..! haha.. despo.