Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

kimsim

Members
  • Content Count

    242
  • Joined

  • Last visited

Everything posted by kimsim

  1. For kitchen cabinet done LED light Side vide
  2. Kitchen light with cabinet a part done already Hood fixed already Power switch
  3. That is original drawing from HDB?Wow improved meant they removed store room at between kitchen to living. But for common quite big, inside the room can add study room somemore, just the toilets portion a smaller & kitchen area, but for kitchen partition can be hack and move a bit into dining area for kitchen has more space. Like your space and have a additional utility room at behind kitchen
  4. If you read more Taiwan program would be learn more, Feng shui very particular on hod & sink. Face to face = argument Hod or sink face window = broken pocket money Distance too close to side by side also not good.
  5. If you want bring back by own for smaller items, for PR/S'rean can re-back $200 for own used stuff, if husband & wife total $400 off then the rest just claim on GST
  6. Mind to share where do you bought it pull up & down cloth rack? How much is the price? Thanks
  7. Delivery around Rm300 per trip, GST 7% from your total amount of the items what you paid for.Let said : Rm1500/2.5 = $600 and X 7% GST, just pay for $42 only. Like my dining table can save around $500-600 cheaper than SG here. Bill & receipt you can ask them open another for you )
  8. There is same quality in singapore ceillini shop, oops forget to add: delivery charge would be add in some GST into mover company, if not just pay for 7% GST only
  9. Just sharing here for self painting on walls or ceiling there is quite easy job & also due to HDB floor height just at 2.6m only. But the difficult works on walls & ceiling touch up works. Common bedroom Master bedroom
  10. Hi Seansow My ID schedule was take me around 1 & half month for complete all. So still keep on going. Here my both toilets Kitchen Note : Kitchen cabinet install next month on mid Nov. Sanitary and basic install 2nd week of Nov. Lighting & electrical points install this week or either next week. My wardrobe delivery around early Nov. The last one, we moving in on early Dec.
  11. Long time didn't updating here, today have minor for updated only He he just received my white stone dining table from Cellini Also done my self painted for false ceiling and it saturday to be continues for walls. :peace: :peace:
  12. Come's and support here for the talks of chit-chat or rather than open as many new thread.
  13. Let's we starter to share for your home Aircon & used experience an over self technical. 1. Would like to share your Aircon brand & also bad experience. 2. Installation isn't bad, such as water dripping, won't cold, noisy or vibration else. 3. How long recent multi split can last or single split more last longer. 4. How often do you changed for whole unit as brand new. 5. How was the used unit to be going for? Thanks you guys & girls for coming to sharing your experience of the day.
  14. I have no idea, how come they quoted you motor replacement, blower motor doesn't related to PCB.
  15. Not sure Fujitsu is good, cause thier spare parts quite expansive and some model still made in Japan. This brand only able to find in singapore, malaysia totally dun have. If wanna get a better brand, I would prefer you over Starmex for easy clean n for sometime you may remove out air vent for clean out internal blower. Starmex also given quiet & cold.
  16. Can someone share your experience the pipe is expose outside, there will be burning when accidentally touch on the hot water pipes.
  17. Minor update photos was taken on friday, hopefully can complete by coming week Kitchen area Common toilet Master bath room
  18. After pay GST still reasonable right
  19. Minor updated after a week job done. Master bathroom Kitchen
  20. Should hack the bedroom 1 wall to be convert into master bedroom cum with toilet.
×