Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

toothytooth

Members
  • Content Count

    22
  • Joined

  • Last visited

Everything posted by toothytooth

  1. the cabinet with granite worktop and SS backsplash cost est ard $3200 - $3600. forgotten exact price. SS backsplash alone is $250.
  2. if not on a tight budget, there a shop at marina square that sell nice and comfortable chairs. forgot the name already though.
  3. i used newspaper to clean my windows. no scratch marks leh. ??
  4. just to check, fo the tv, can they deliver first then do the mounting on other day?
  5. it should be on the right of the main door
  6. it's not about the complaint but to let HDB and the home owners know that what they had done to the flooring. it is by no industiry standard in the way they lay the tiles. cement AND the cement adhesives has to be used. anyway, we have the right to ask them to redo the entire flooring if they had not used the proper ingredients or procedure since in no time, the flooring will warp without the cement. you can live with it now, but once your tiles all pop up, you will know the hassle. this is simply unacceptable as they just want to get over and done with. look ok on the surface, but inside all hollow.
  7. they simply put the tiles onto the concreate slab with a lil bit of adhesive and then put up the grout lines. that also explain how they managed to removed all my old tiles INTACT with no cracks at all.
  8. just a quick note to all that had changed the tiles in the living/dining area. did you notice that there were no cement at all when they last lay the tiles? you can only find out when they redo the flooring for you. was shock to find no traces of cement at all when they took off the old tiles. that Mr Tan gave me some excuses and shown me charts that it's HDB new standard they they are using cement adhesives now, no more cement. it's only when i saw the workers used cement AND the cement adhesives when they relay the new tiles then i know they were actually trying to lie to me. had pictures taken before and after. going to lodge a formal complain to HDB office after they handover to me. think they had shortchange all of us.
  9. hope to see mor pics. i'm at 675A.
  10. list down what had you setup for your wireless network. i.e. security protocols used. network adaptors for the mac. and etc
  11. the system is free if you sign up the 3 years premium plan with them. i'm also kinda worried about the security in this area as so many units are vacant at the moment. i would be coming back at different timing with my wife. still discussing with her for the needs.
  12. had considered before. still cannot make up my mind. you checked out the prices already? last checked i believe was over 1.5k for their system.
  13. wow....way over my budget. wanted this av receiver but think now have to settle for something less till the finance allows.
  14. just to check how much did you pay for the 605 with the wharferdale speakers @ KEC.
  15. 675A : samluvbliss, toothytooth 675B : Spotkev, Alexter, greenskyiv 676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt 676B : crazygirl48, roseberry, shutiao06, popeye gal 677A : cyanide, bpheng 677B : shootmie 677C : inuya5ha 678A : teodami, Commando, bubbletan, jogal, baby_whyme 678B : rav3n, GraCieGaL 678C : missyling 678D : dar80, NiVleK list updated.
  16. need some advice over the following quote. ================== Kitchen Area 1 To overlay approx. 360sqft wall tiles at kitchen area. 2 To overlay floor tiles at kitchen area. 3 approx .37ft long kitchen cabinet in ABS trimming laminated finish and stainless steel dishwasher 4 To do piping work for sink area. 5 Base for fridge and washing machine MBR and Toilet 5 To overlay approx.210sqft wall tile at master bedroom toilet. 6 To overlay floor tiles at master bedroom toilet. 7 Design MBR toilet with mirror, vanity top and cabinet 8 TV console 9 2 x movable bedside table Living/Dining 10 Full Height 6ft length shoe cabinet at entrance 11 feature wall **** area to cover storeroom door BR2 and BR3 12 8ft Study Table 13 8ft Alumix Pole system wardrobe (2440 by 2400mm) Aux Items 14 To do protection at existing flooring with corragated paper. 15 To do chemical washing 16 To do painting for the unit.(ICI/Nippon) with touchup 17 Window shield for all windows 18 Installation of all bathroom accessories and storage heater total $14000 ================ is this quote ok? too cheap or too ex?
  17. they are relaying my living and dining floor tiles, all 3 bedrooms parquet flooring, changing all the skirtings in the house. evening of all walls. then they will start the minor defects like doors, locks, windows and etc. said would be done within 2 more weeks but i assume end of the month going by their standard and speed of work. sigh...
  18. Hi All, i'm from 675A. currently HDB rectifying my living/dining flooring and all my bedrooms parquet. just saw them completing the sanding of the parquet today. they will continue with the living area in the next 2 days. hopefully everything be ready by end of the month.
×