  1. Hi, Was wondering if it is normal for shelves in cabinet to be slightly misaligned and that laminates has bumps on the edges. Also is it normal for there to be holes that are covered with a white round sticker? when i brought this up to my id, they told me it is a normal problem in the industry.... and that it is normal to have those holes in the wood because of how they fabricate it.... that some company wont even cover it up with the sticker. Tried looking at several pictures in the T-blogs but cannot identify a picture clearly :( thanks...
  2. utor

    Taobao Order

    hi want to order lots of hangers through tb, can pm me the details? thanks
  3. Hi! I wish to ask some third party opinion. I got my marble flooring (white cored) laid fairly recently (about a month) and realised that there tiles with spots of grey/totally greyish in color. I checked with the marble supplier and was told that it is due to sealant being applied and that marble, being a natural stone have different absorbance level and that given time (up to 6 mths!) The sealant shld ne totally absorbed and it shld be the same color tone. I cant find any information to corroborate with what the marble supplier said so I am wondering if anyone has similar or knows any similar cases! Thanks in advance!
  4. Hi, Those binds are nice! can I check where did you get it from and how much it costs? I forgot to budget for curtains and binds!
  5. Oh my...! The sofa looks really good, can share the shop and price?? thanks!
  6. Oh they don't? But still easy to bloat from water right? I took marble because my parents insisted lol...
  7. Hi! In a dilemma now. My dad wants me to do marble flooring for my new 4 room flat. I dont mind but I wanted to do only living room and walkway. He keep scaring me with stories of the problem with laminates, if spoil must change my whole floor.. build in stuff have to remove.. termites etc etc. But we feel laminates foe bedroom is very nice and gives a warmer feeling and not to mention it is cheaper. Seeking opinion on my delimma... go ahead do all marble or do marble in living and walkway, laminates for bedroom but my dad not happy..?
  8. Looking! In fact, another id said that our expectation would hit 50k! So I think I will have to revise our expectations...
  9. Thanks for the advice Jerry, I agree with your advice! However, the quotes the other ID that I have thus far received is not very comparable because it did not include quite a number of things we wanted done. We wouldnt mind contractor over IDs but me and wifey job's places a lot of demand on us (very long hours) and we are afraid we cannot squeeze time to monitor the projects :\ Actually I wanted to know if the price is reasonable for the things that I wanted to do. most of the costs are from the carpentry for the study/home office with all the bookshelves and the wardrobe. I mean, we sat down with the ID to get a picture of what was quoted so I can at least safely say that we are satisfied that the quote includes most of the items that we wanted done but not sure if the prices are right or if our expectations are too unreasonable.
  10. Hi, I just got an initial quote from the ID, as we are terribly inexperienced, would appreciate if someone could just advise if the quote is reasonable! A little background, we are a young couple with is a new 4 room HDB unit (94sqm). So far, we only received 2 quotes but felt that the ID missed out a lot of things that we wanted to do, thus we couldn't compare the quotes. This ID I got was quite engaging and so far, included most of the things that we desired. But I am still afraid that being inexperienced (I did stalk the forum for some time already but it is still quite confusing!), I am afraid that I might be taken as a carrot to chop! So anyway, quote is as below is unfortunately still too high for us (45k! mainly, i think, due to the inclusion of a dedicated room for wardrobes and a study/home office) so there is going to be some revision. (item 1-6 relates to Id services such as 3d drawing, consultation etc..) Flooring/masonry works Living, household shelter, 3 bedrooms 7. Supply material & labour to lay 60x60cm homogeneous floor ties c/w skirting **** and household shelter ($2,450) 8. Supply material & Labour to lay laminate flooring c/w skirting at 3 bedrooms ($1,935) bathrooms 9. Supply material & labour to construct entrance kerb at master and common bathroom ($200) 10. Suppler material & labour to construct shower kerb at master and common bath room ($200) Kitchen 11. Supply material & labour to construct cement motar base c/w tiles skirting for kitchen cabinet ($200) 12. Supply material & labour to construct fridge base c/w tiles finished ($120) 13. Supply material & labour to construct washing machine base c/w tiles finished ($120) Plumbing works 14. Supply labour to run outlet pipe for washing machine at service yard ($80) 15. Supply labour to install kitchen sink and tap ($80) 16. Supply labour to install 02xbedect spray at master & common bathroom ($60) 17. Supply labour to install storage water heater at common bathroom ($150) 18. Supply labour to install toilet accessories at both bathroom ($200) Electrical works 19. Refer to electrical price list (Estimated amount only) ($1,000) Ceiling/plaster works 20. Supply and labour to erect L box c/w cove light pelmet **** ($1,200) 21. Supply and labour to erect L box c/w cove light pelmet at master bedroom ($450) Painting 22. To paint internal walls of whole unit using Nippon emulsion paint (5 colors excluding 1 ceiling white) ($1,400) Aluminium/glass works 23. Supply material & labour to install p-d door (acrylic range) at master and common bathroom ($680) 24. Supply material & labour to install 2 pcs of 10mm tempered clear glass sliding door at kitchen entrance ($1,250) 25. Supply material & labour to install 5mm glass backing at kitchen ($400) 26. Supply & labour to install 10mm tempered glass shower screen c/w fixed panel and 1 swing door at master bathroom (1.9m height) ($550) Carpentry works Living/Dining 27. Fabricate and install L5" shoe cabinet (half ht) in selected laminate finishing ($1,400) 28. Fabricate and install L8" feature wall in selected laminate finishing ($2,240) 29. Fabricate and install L8" Tv console (slim) in selected laminate finishing ($1,120) Kitchen 30. Fabricate and install L23" kitchen cabinet (top and bottom) in selected laminate finishing ($2,760) 31. Fabricate and install L10" black galaxy worktop c/w single profile ($1,200) Master bedroom 32. Fabricate and install L7" sliding door wardrobe (full ht) in selected laminate finishing at master bedroom ($1,960) 33. Fabricate and install L12" bedhead (full ht) c/w storage and 2 side table in selected laminate finishing ($3,360) 34. Fabricate and install L4" shelving for players in selected laminate finishing ($160) Bedroom 3 35. Fabricate and install L13" sliding door wardrobe (full ht) in selected laminate finishing at bedroom 2 ($3,640) 36. Fabricate and install L10" settee (half ht) c/w storage in selected laminate finishing at bedroom 2 ($2,100) 37. Fabricate and install L5" dresser cw mirrow and drawer in selected laminate finishing at bedroom 2 ($1,200) Bedroom 2 38. Fabricate and install L5" book shelves (full ht) c/w clear glass doors in selected laminate finishing ($1,400) 39. Fabricate and install L11" study table c/w drawers in selected laminate finishing ($1,650) 40. Fabricate and install L7" top hung cabinet in selected laminate finishing ($960) 41. Fabricate and install L9" book shelves (half ht) in selected laminate finishing ($1,890) bathrooms 42. Fabricate and install L3.5" vanity cabinet in selected laminate finishing in master bathroom ($420) 43. Fabricate and install L3.5" solid surface worktop in single profile in master bathroom ($300) 44. Fabricate and install L3.5" mirror c/w cove light holder in selected laminate finishing in master bathroom ($525) 45. Fabricate and install L3.5" vanity cabinet in selected laminate finishing in common bathroom ($420) 46. Fabricate and install L3.5" solid surface worktop in single profile in common bathroom ($300) 47. Fabricate and install L3.5" mirror c/w cove light holder in selected laminate finishing in bathroom ($525) Total: $42,275 GST: $2959.25 Final Total: $45,234,25 TIA!
  11. Your house is looking really neat! mind sharing the ID and quote? thanks!
  12. Hi, can share id and quote? thanks!
  13. Hi, can share your quote and reno contact? Thanks!
  14. Hi, been stalking this forum on and off but I am still clueless! the scope of renovation is so daunting! If you could just share the tips you collected and ur ID contact, it would be great Thanks
×