Everything posted by h4happy
-
My Lovenest At Jalan Membina
Oic....thanks for your information. That really helps to choose the correct laminating.
-
My Lovenest At Jalan Membina
Hi BIN You are referring to white laminate cabinet? I might go for lighter colour but no pure white. And also have in mind are those shiny or semi-glossy laminated cabinate. Oh, is it 2 lighting points? I am looking for those bulbs without casting...those energy saving light...it grow when it switch on.... My house currently using those circuit switch including kitchen. Press one, only one bulb lights up, press twice, 2 light up, press 3 time, all lights up...those bulbs. Very very bright.
-
My Lovenest At Jalan Membina
Hi JASCH I think the only way is to have bright colour, bright or shiny laminated cabinet. And ceiling lights, maybe have 2 ceiling lights? Just a very general knowledge, kitchen must be bright and not dark.
-
Xl-dreamhouse
HI Xlan Is that id plan for you the renovation schedule? Very detail and clear!
-
My Sweet Home
25B Road side yellow paint is fully up
-
My Lovenest At Jalan Membina
I think it really depends on the family member bai zhi. I am also seeking fsm when I get my key and will be like Yang, definately need to shift and change position. So, id will have to re draw again.
-
My Lovenest At Jalan Membina
Wow...major change again.... I think everything especially carpentry works all must put on hold liao!
-
Newbies @ Jalan Membina
Count me in also. Kpo kpo hehehe... Hi Cindy That is really nice and considerate ID! Not all id are like that! HAPPY
-
Newbies @ Jalan Membina
Hi BINZ Who is the contractor/id? Should be ok to say it here than pm right?
-
Newbies @ Jalan Membina
Hi Owens Can I have your pic put into my blog?? Thanks!! HAPPY
-
Stove Placing Beside Fridge
Yeah I also think so, only half wall and the other half will be tamper glass right up to the ceiling.
-
Xl-dreamhouse
Yes! Ground zero pics!!!
-
Our Home!
Wow, your living room is very big! Show us more of your reno pics!
-
My Lovenest At Jalan Membina
Oh, is it beside the kitchen main door wall? How about the door, will it knock against the shoe cabinet? Or your shoe cabinet is the other side not the kitchen wall? A very good idea from you to usefully use up the limited space! I never think of that!
-
Stove Placing Beside Fridge
I might ask my confirmed ID to construct a wall beside the fridge if really FSM say it is a MUST to have the stove there.
-
Newbies @ Jalan Membina
Is it Yan ZhongShui (spelling correct?)? Called up few years ago, their charges is abt $1,800+ for 2 hours on site reading by the master. It is very expensive indeed.
-
Stove Placing Beside Fridge
Well, dont know whether can have a conrete wall built beside the fridge and then place aluminin sheets beside the concrete wall??
-
My Lovenest At Jalan Membina
Hi Yang Guo How your install your shoe cabinet? Is it at the wall facing the main door? Thanks! HAPPY
-
Newbies @ Jalan Membina
Our future MP.... For your kids, child care and kindergarden...just a walking distance away from our new Jalan Membina flats.
-
Newbies @ Jalan Membina
Hi SPAR Summit Design. $19k++ inclusive of what items? Yeah...belong to a low side of cost. Thanks!! HAPPY
-
My Lovenest At Jalan Membina
Toilet is consider dirty and stove is consider cook food for stomach and for family. So cannot sao-chiong!
-
Newbies @ Jalan Membina
Hi Membinans... I am not pouring any cold water to everybody. But plse be aware and take note that using dryer will spoilt your clothing faster. But no harm buying if only use during raining seasons or weather is wet for couple of weeks. Cheers! HAPPY
-
My Lovenest At Jalan Membina
I also think so that stove cannot directly opposite the window. So the only place is near the fridge.
-
My Lovenest At Jalan Membina
Hi Yang Guo Wow, nice and wonderful 3d pictures. A good idea to have your oven mounted on the wall!!!! Hey your kitchen cabinet also have a pull out table that can be push to the other corner? Can act as a movable island! Good idea!!! Waiting for more pic/photos.... HAPPY
-
Newbies @ Jalan Membina
I also not sure. I think the kitchen tiles and wiring still have some outstanding. But my guessing is once windows are installed and the paint are up and the internal are up, the inspectors will come and inspect all the units. That will take at least 1 month plus (as blk25b has the most units). So maybe by end of dec 07, the inspections will be complete and then hand over the keys to the hdb. After that, hdb will give out batch by batch probably around Mid Jan to end of Feb or maybe even early mar 08.