Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Bedok Central

Featured Replies

Everyone from Jan BE - What your schedule of picking up keys. thanks.

i will be collecting mine this thur..

i think yours is gg to be soon since your HLE has been approved..

  • Replies 3.9k
  • Views 680.9k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Regarding quotations.... As mine is low budget (unlike some of you) was looking for ID's and comparing cost.... Just wanted basic's reno only... done first... so i came up with a need list of rennov

  • frederick_chia
    frederick_chia

    Jovi dropped by this afternoon & confirmed no pipe leakage in my unit. However, she also cannot give a confirmed explanation on the damp walls. What's worse, some walls are turning moldy liao. Can

  • Author
Hey Big Orange, i already got my keys a week ago.

Jan Be or SERS?

i will be collecting mine this thur..

i think yours is gg to be soon since your HLE has been approved..

usual. u BE or SERS?

hi big orange, i think the schedule for taking keys should be according to when the block is completed rite? regardless whether you are from sers or BE group. those from 220a which is first to complete should be already gotten keys ba?

so those unpainted block, i predicted should be july/aug lo after china construction handed to hdb and hdb did a check on the flats.

so far i had contact with U home director, he is a friendly guy, willing to explain to you most of the stuffs but yet to be very convinced about the works, and heard some not so good feedback about the company from the forum now...so still pondering.

also contact with coos design,so far saw quite positive works from them with reno for flats in sengkang.

and also considering ideal home which is recommend by some members here...

so these are the 3 ID which i am considering at the moment....

Jan Be or SERS?

usual. u BE or SERS?

oredi said i m from BE.. ha!

Edited by mocchi

i don think is based on completion of flat.. me 220B completed and got ppl live inside.. but i still haven get my keys n HLE approved.. i think is by q no or wat so..

anyway.. wait lo.. the flat will run away.. hehe :dancingqueen:

it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor.

some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there.

  • Author

so far, i think i will contact

1. idealhose

2. plush living

3. Gplan

4. Intradesign

5. Defong

6. Citydesign

7. Classic Design

8. Ho Bee

Do you think these will do? no point asking too much quotation? right?

If there is any very good one. please let me know.

TIA.

Edited by big orange

so far, i think i will contact

1. idealhose

2. plush living

3. Gplan

4. Intradesign

5. Defong

6. Citydesign

7. Classic Design

8. Ho Bee

Do you think these will do? no point asking too much quotation? right?

If there is any very good one. please let me know.

TIA.

I think this should be enough for a start. Too many = headache :dunno:

it should be in each blk there will consist of pple from SERS and BE cases. SERS select the flats first. after which the remaining are put up for BE. you will notice most of the BE are not so high floor.

some SERS & BE will get their Key first as the Flat is completed. eg. 220A, some SERS may had already finish Reno. in fact my neighbour alrady living there.

Maybe your neighbour is my dad :P . Which floor did you get?

  • Author
I think this should be enough for a start. Too many = headache :dunno:

Maybe your neighbour is my dad :P . Which floor did you get?

my idea of taking key is same as yokoyoko.

SERS - go 1st.

Follow by

BE by Que # (whenever possible since there are some blks have not completed)

:)

will be going down today to see defong ID work. Anyone interested? last call.

Arrange around 3pm. Drop me with ur number. I will text you.

How is defong's ID work?

  • Author
How is defong's ID work?

personally it good. i feel lo.

waiting for their quote now.

personally it good. i feel lo.

waiting for their quote now.

did u take any pic?

To Everyone: Anyone knows ... once we get the keys, will HDB impose a certain period of time which we will have to start renovating? Or can we leave it vacant until we're comfortable with starting?

Hi Cacky

From: HDB Renovation guide FAQ

Q6.How much time am I given to complete my renovation work? How

soon would I need to commence the renovation works in my new flat

and the frequency of the renovations allowed in a flat?

For new blocks, you must complete the approved renovation works within four months from

the date of the renovation permit. For established blocks, the approved work must be

completed within one month from the date of the renovation permit. This is to minimise any

inconvenience and noise nuisance to the existing residents.

There is no restriction on when the renovation works should be carried out by the flat owners

and/or the frequency of the renovation. This is to facilitate flat owners in the planning of the

renovation in their flats, in terms of their financial resources and time schedule.

Q11. I can't complete the renovation works within the time allowed?

What should I do?

Your registered renovation contractor can submit the request for extension of the

renovation period via the “Application For Renovation Permit via Electronic Transaction”

system (APEX) through the HDB InfoWEB at www.hdb.gov.sg under “E-Services

>Housing Admin E-Services (HAES)>Submit an e-Application>Renovation Permit”.

HDB Branch Office will accede to the request if the reasons given are justifiable.

Edited by LimeGreen

  • Author
did u take any pic?

sorry i didnt.

Actually another couple went with me.

prehaps they can shed some lights?

lineargreen3011ar1.th.jpg lineargreen4ko0.th.jpg lineargreen1wk8.th.jpg lineargreen2rx3.th.jpg

Edited by DSA

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.