May 16, 201016 yr Author Ah... The phase 2 drawings as promised.. Thanx jaskel! Can't wait for the last phase drawings!
May 16, 201016 yr Author Erhm, think tat is actually 2D pictures.. Anyway, nope, drawings are not done by me, but rather, done by jaskel.
May 17, 201016 yr Erhm, think tat is actually 2D pictures.. Anyway, nope, drawings are not done by me, but rather, done by jaskel. Actually its 3D sketch up. Normally contractors won't be providing this to customers. Doing this as a hobby first before purchasing the real 3D software which cost thousand of bucks and also better space planning as it will give me a est. measurement.
May 17, 201016 yr Day 1(Mon 10/05/2010) - Day 5 ~ Hacking and clearing of debris Common Bath Kitchen Kitchen Kitchen Master Bedroom False ceiling and Bathroom door frame Edited May 17, 201016 yr by jaskel
May 17, 201016 yr Day 6 (Mon 17/05/2010) - Day 10 ~ Tiling of 2 Bathroom walls and Cement plastering of Kitchen walls Master bath Master bath Master bath Kitchen walls Edited May 24, 201016 yr by jaskel
May 17, 201016 yr Material Normal cement, plastering, floor protection paper 2 different types of sand used for different purposes Another type of cement for tiles only Another type of cement for waterproofing only Quick Seal 104 for waterproofing of 2 bathrooms & kitchen flooring and upturn 100mm on walls There are different brands of cement so is not necessary that other contractors/IDs must used the one I posted. There is another bag of waterproofing material that will be use also but I will not post it here. ...if not those newbie contractor or ID will know too much info for free. Edited May 17, 201016 yr by jaskel
May 17, 201016 yr A small unforesee problem arise. 17 tiles found to be cracked after dismantling the boxes. Need to call up the tiles shop to replenish the tiles if not will delay the work process. Need to let the tiles absorb water before tiling it up. Edited May 17, 201016 yr by jaskel