Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Cement Screed First Or Door Frames First

Featured Replies

Could anyone advise me, please?

I am renovating my house, an old executive condo, bought recently. I would change my 3 bedroom doors and their frames. I would also change my main entrance, fire-proof door and the frame. The floor has already been hacked. I would have marble flooring for the living n dining rooms. The marble is not laid yet. I am keeping the parquet flooring in the 3 bedrooms.

What I am very worried about is this:

1) Should the door frames be installed first, then lay the cement screed on the floor in the living and dining rooms? The marble slaps will later be laid on the cement screed.

2)Or should the cement screed be laid first, then install the door frames?

Could you please advise me? What are the advantages and disadvantages of taking option 1 or 2?

I will appreciate your advice.

Thanks.

usually the screeding should be done first, and then the finishes (your marble tiles) applied onto it.

if u're changing all doors, then the qn is whether the house can function without the doors during construction! u mentioned changing the front door as well as room doors!

i would leave installing the doors till after the floor finishes are in; the main door/fire door can be left in, while the finishes are applied, so u can at least lock ur unit i guess!..unless u are comfortable just locking your gate!

floor finishes can negotiate around the main door/frames without much problems.

hope this helps..:)

cheers

m.

Could anyone advise me, please?

I am renovating my house, an old executive condo, bought recently. I would change my 3 bedroom doors and their frames. I would also change my main entrance, fire-proof door and the frame. The floor has already been hacked. I would have marble flooring for the living n dining rooms. The marble is not laid yet. I am keeping the parquet flooring in the 3 bedrooms.

What I am very worried about is this:

1) Should the door frames be installed first, then lay the cement screed on the floor in the living and dining rooms? The marble slaps will later be laid on the cement screed.

2)Or should the cement screed be laid first, then install the door frames?

Could you please advise me? What are the advantages and disadvantages of taking option 1 or 2?

I will appreciate your advice.

Thanks.

Could anyone advise me, please?

I am renovating my house, an old executive condo, bought recently. I would change my 3 bedroom doors and their frames. I would also change my main entrance, fire-proof door and the frame. The floor has already been hacked. I would have marble flooring for the living n dining rooms. The marble is not laid yet. I am keeping the parquet flooring in the 3 bedrooms.

What I am very worried about is this:

1) Should the door frames be installed first, then lay the cement screed on the floor in the living and dining rooms? The marble slaps will later be laid on the cement screed.

2)Or should the cement screed be laid first, then install the door frames?

Could you please advise me? What are the advantages and disadvantages of taking option 1 or 2?

I will appreciate your advice.

Thanks.

Hacking on old flooring, dismantling doors & frames.

Set up raw door frames (pre-made in factory)with support of some wood (horizontal & verticle). Lay marbles, so bottom of door frame embed firmly within marble slabs.

Can do otherwise, but length of verticle frames must be ensured to fit the height(sit on marble) - usually ppl make the length slightly longer & knock "force in"- you know...wall (top of door) may crack after some time due to mechanical stress differences over the area.

Edited by bepgof

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.