March 9, 201115 yr Dear frens, I am new to this forum and recently just brought a new resale 5rm flat. I was being quoted the following for toilet and kitchen, total around 19k? Can someone advise if this is too ex, since there's no hacking of tiles, quotation is for overlay only! Masonry work. Supply and overlay selected floor tiles for kitchen. $1,450.00 Supply and overlay selected wall tiles for kitchen. $2,950.00 Supply and overlay selected floor tiles for SCV balcony. $650.00 To construct 50mm height cabinet base with side tiles finishing. $150.00 To construct 50mm height washng machine tiles finishing. $150.00 To construct 50mm height fridge with tiles finishing. $150.00 To construct 2nos. Shower kerb for 2nos. Bathrooms. $240.00 Supply and overlay selected floor tiles for 2nos. Bathrooms. $900.00 Supply and overlay selected wall tiles for 2nos. Bathrooms. $2,900.00 Carpentry work Design and fabricate L40fts kitchen cabinet in solid plywood with laminate finishing with ABS trimming door. $4,400.00 Supply and install 1nos. Stainless steel dish tray. $150.00 Supply and install L18fts surface counter top for kitchen cabinet. $1,170.00 Design and fabricate 1set solid plywood with laminate finishing and ABS trimming door suspended cabinet cum solid surface counter top vanity cabinet with mirror set at master bathroom.$1,250.00 Plumbing work Supply and install stainless steel piping for kitchen and 2nos. Bathroom. $750.00 Supply labor to install kitchen sink, tap c/w drainage system. $85.00 Supply labor to install bathroom accessories. Foc Supply labor to install 2nos. Instant heater.. $120.00 Supply labor to install 2nos. Toilet bowl. $240.00 Supply labor to install 2nos. Basin. $120.00 Tempered glass work Supply and install tempered glass shower screen at common bathroom $450.00 Supply and install tempered glass shower screen at master bathroom $450.00 Door work Supply and install 2nos. Aluminum frame with PVC panel bi-fold door at 2nos. Bathroom. $440.00 Hacking work; Labor to dismantles existing kitchen cabinet. Labor to dismantles existing toilet bowl , basin,etc. Labor to dismantles existing bathroom door. Supply labor and transport to clear renovation debris. Sub total; $950.00 Total: 19,165 Thanks very much!
March 9, 201115 yr Dear frens, I am new to this forum and recently just brought a new resale 5rm flat. I was being quoted the following for toilet and kitchen, total around 19k? Can someone advise if this is too ex, since there's no hacking of tiles, quotation is for overlay only! Masonry work. Supply and overlay selected floor tiles for kitchen. $1,450.00 Supply and overlay selected wall tiles for kitchen. $2,950.00 Supply and overlay selected floor tiles for SCV balcony. $650.00 To construct 50mm height cabinet base with side tiles finishing. $150.00 To construct 50mm height washng machine tiles finishing. $150.00 To construct 50mm height fridge with tiles finishing. $150.00 To construct 2nos. Shower kerb for 2nos. Bathrooms. $240.00 Supply and overlay selected floor tiles for 2nos. Bathrooms. $900.00 Supply and overlay selected wall tiles for 2nos. Bathrooms. $2,900.00 Carpentry work Design and fabricate L40fts kitchen cabinet in solid plywood with laminate finishing with ABS trimming door. $4,400.00 Supply and install 1nos. Stainless steel dish tray. $150.00 Supply and install L18fts surface counter top for kitchen cabinet. $1,170.00 Design and fabricate 1set solid plywood with laminate finishing and ABS trimming door suspended cabinet cum solid surface counter top vanity cabinet with mirror set at master bathroom.$1,250.00 Plumbing work Supply and install stainless steel piping for kitchen and 2nos. Bathroom. $750.00 Supply labor to install kitchen sink, tap c/w drainage system. $85.00 Supply labor to install bathroom accessories. Foc Supply labor to install 2nos. Instant heater.. $120.00 Supply labor to install 2nos. Toilet bowl. $240.00 Supply labor to install 2nos. Basin. $120.00 Tempered glass work Supply and install tempered glass shower screen at common bathroom $450.00 Supply and install tempered glass shower screen at master bathroom $450.00 Door work Supply and install 2nos. Aluminum frame with PVC panel bi-fold door at 2nos. Bathroom. $440.00 Hacking work; Labor to dismantles existing kitchen cabinet. Labor to dismantles existing toilet bowl , basin,etc. Labor to dismantles existing bathroom door. Supply labor and transport to clear renovation debris. Sub total; $950.00 Total: 19,165 Thanks very much! Its reasonable
March 9, 201115 yr Hi, For your reference - Items for kitchen and 2 toilets (Kitchen) Demolition Work 01. Hack off existing floor tiles 02. Hack off existing wall tiles 03. Dismantle existing kitchen cabinet 04. Dismantle existing water pipe 05. Dismantle existing wiring / casing Wet Works 06. Provide building materials 07. Provide designer wall tiles ($2.80 psf) max. 400sqft 08. Provide designer anti-slip homogeneous floor tiles ($3.20 psf) 09. Apply waterproofing membrance using 104 Quickseal 10. Provide labour to construct kitchen cabinet base 11. Provide labour to construct fridge base 12. Provide labour to construct washing machine base 13. Provide labour to lay kitchen wall tiles 14. Provide labour to lay ktichen floor tiles Plumbing Works 15. Provide labour and materials to install new stainless steel water pipe (cold) 16. Provide labour and materials install new inlet / outlet pipe (PVC) 17. Provide labour to install 1 set of kitchen sink and tap 18. Supply 1 set of stainless steel double bowl kitchen sink 19. Supply 1 set of kitchen sink tap Electrical Works 20. Provide labour and materials to install new casing for kitchen 21. Provide labour and materials to install 2 nos of lighting points 22. Supply 2 sets of ceiling lights 23. Provide labour to install 2 sets of ceiling lights Carpentry Works 24. Design, fabricate and install 20 feet ktichen cabinet with ABS trimming in laminate finish 25. Fabricate and install 10 feet kitchen top using solid surface 26. Provide labour and materials to install 1 set of built in dishrack 27. Provide labour and materials to install 1 panel of stainless steel backing at hob area 28. Supply 1 set of branded stainless hood 29. Supply 1 set of branded glass hob 30. Supply 1 set of cutlery tray Miscellaneous 31. Provide cardboard protection during renovation 32. Chemical / Acid wash after renovation (Master and Common Bathroom) Demolition Works Hack off existing floor tiles Hack off existing wall tiles Dismantle existing pedestal bowl Dismantle existing wash basin Dismantle existing bathroom accessories Dismantle existing water pipe Dismantle existing wiring / casing Wet Works Provide building materials Provide designer wall tiles ($2.80 psf) max. 400sqft Provide designer anti-slip homogeneous floor tiles ($3.20 psf) Apply waterproofing membrance using 104 Quickseal Provide labour to construct shower kerbs Provide labour to lay wall tiles Provide labour to lay floor tiles Plumbing Works Provide labour and materials to install new stainless steel water pipe (cold) Provide labour and materials install new inlet / outlet pipe (PVC) Provide labour to install 2 sets of pedestal bowl Provide labour to install 2 sets of wash basins and taps Provide labour to install 2 sets of instant heaters Provide labour to install 2 sets of bathroom accessories Supply 2 sets of otto / baron dual flush pedestal bowl Supply 2 sets of otto / baron wash basin Supply 2 sets of wash basin tap Supply 2 sets of instant heaters (Customer Choice not excess $200.00) Supply 2 sets of 7 pcs bathroom accessories Supply 2 nos of wall mirror Electrical Works Provide labour and materials to install new casing for both bathrooms Provide labour and materials to install 2 nos of new heater points Provide labour and materials to install 2 nos of lighting points Provide labour to install 2 sets of ceiling lights Miscellaneous Provide cardboard protection during renovation Chemical / Acid wash after renovation Kitchen at $12,880 + 2 Bathrooms at $8,900 = $21,780 Promotion Items Supply and install 01 set of 1 fixed + 1 swing shower screen using 10mm thick clear tempered glass - $358.00 Supply and install 02 sets of aluminium bi-fold door at $158 each - $316.00 Total: $22,454.00 ($12,880 + $8,900 + $358 + $316) Edited March 9, 201115 yr by blackwhite.sg
March 9, 201115 yr Dear frens, I am new to this forum and recently just brought a new resale 5rm flat. I was being quoted the following for toilet and kitchen, total around 19k? Can someone advise if this is too ex, since there's no hacking of tiles, quotation is for overlay only! Masonry work. Supply and overlay selected floor tiles for kitchen. $1,450.00 Supply and overlay selected wall tiles for kitchen. $2,950.00 Supply and overlay selected floor tiles for SCV balcony. $650.00 To construct 50mm height cabinet base with side tiles finishing. $150.00 To construct 50mm height washng machine tiles finishing. $150.00 To construct 50mm height fridge with tiles finishing. $150.00 To construct 2nos. Shower kerb for 2nos. Bathrooms. $240.00 Supply and overlay selected floor tiles for 2nos. Bathrooms. $900.00 Supply and overlay selected wall tiles for 2nos. Bathrooms. $2,900.00 Carpentry work Design and fabricate L40fts kitchen cabinet in solid plywood with laminate finishing with ABS trimming door. $4,400.00 Supply and install 1nos. Stainless steel dish tray. $150.00 Supply and install L18fts surface counter top for kitchen cabinet. $1,170.00 Design and fabricate 1set solid plywood with laminate finishing and ABS trimming door suspended cabinet cum solid surface counter top vanity cabinet with mirror set at master bathroom.$1,250.00 Plumbing work Supply and install stainless steel piping for kitchen and 2nos. Bathroom. $750.00 Supply labor to install kitchen sink, tap c/w drainage system. $85.00 Supply labor to install bathroom accessories. Foc Supply labor to install 2nos. Instant heater.. $120.00 Supply labor to install 2nos. Toilet bowl. $240.00 Supply labor to install 2nos. Basin. $120.00 Tempered glass work Supply and install tempered glass shower screen at common bathroom $450.00 Supply and install tempered glass shower screen at master bathroom $450.00 Door work Supply and install 2nos. Aluminum frame with PVC panel bi-fold door at 2nos. Bathroom. $440.00 Hacking work; Labor to dismantles existing kitchen cabinet. Labor to dismantles existing toilet bowl , basin,etc. Labor to dismantles existing bathroom door. Supply labor and transport to clear renovation debris. Sub total; $950.00 Total: 19,165 Thanks very much! can i be invite to quote also .. i will do it for 18500...
March 10, 201115 yr Dear frens, I am new to this forum and recently just brought a new resale 5rm flat. I was being quoted the following for toilet and kitchen, total around 19k? Can someone advise if this is too ex, since there's no hacking of tiles, quotation is for overlay only! Masonry work. Supply and overlay selected floor tiles for kitchen. $1,450.00 Supply and overlay selected wall tiles for kitchen. $2,950.00 Supply and overlay selected floor tiles for SCV balcony. $650.00 To construct 50mm height cabinet base with side tiles finishing. $150.00 To construct 50mm height washng machine tiles finishing. $150.00 To construct 50mm height fridge with tiles finishing. $150.00 To construct 2nos. Shower kerb for 2nos. Bathrooms. $240.00 Supply and overlay selected floor tiles for 2nos. Bathrooms. $900.00 Supply and overlay selected wall tiles for 2nos. Bathrooms. $2,900.00 Carpentry work Design and fabricate L40fts kitchen cabinet in solid plywood with laminate finishing with ABS trimming door. $4,400.00 Supply and install 1nos. Stainless steel dish tray. $150.00 Supply and install L18fts surface counter top for kitchen cabinet. $1,170.00 Design and fabricate 1set solid plywood with laminate finishing and ABS trimming door suspended cabinet cum solid surface counter top vanity cabinet with mirror set at master bathroom.$1,250.00 Plumbing work Supply and install stainless steel piping for kitchen and 2nos. Bathroom. $750.00 Supply labor to install kitchen sink, tap c/w drainage system. $85.00 Supply labor to install bathroom accessories. Foc Supply labor to install 2nos. Instant heater.. $120.00 Supply labor to install 2nos. Toilet bowl. $240.00 Supply labor to install 2nos. Basin. $120.00 Tempered glass work Supply and install tempered glass shower screen at common bathroom $450.00 Supply and install tempered glass shower screen at master bathroom $450.00 Door work Supply and install 2nos. Aluminum frame with PVC panel bi-fold door at 2nos. Bathroom. $440.00 Hacking work; Labor to dismantles existing kitchen cabinet. Labor to dismantles existing toilet bowl , basin,etc. Labor to dismantles existing bathroom door. Supply labor and transport to clear renovation debris. Sub total; $950.00 Total: 19,165 Thanks very much! Think too expensive. Saw a Pormotional Package at an ID Firm in TradeHub 21. Resale HDB 5-room Apartment for Kitchen & 2-Toilets, at $16,800. This offer includes hacking of old tiles on floor & wall + new waterproofing. Was told they are a new branch and offering cheap now. Showroom around 1500sq.ft. If interested can PM you their Package. Edited March 10, 201115 yr by PapaYeo
March 10, 201115 yr Author Think too expensive. Saw a Pormotional Package at an ID Firm in TradeHub 21. Resale HDB 5-room Apartment for Kitchen & 2-Toilets, at $16,800. This offer includes hacking of old tiles on floor & wall + new waterproofing. Was told they are a new branch and offering cheap now. Showroom around 1500sq.ft. If interested can PM you their Package. thanks papayeo! Can you pm me the package info?
March 10, 201115 yr Think too expensive. Saw a Pormotional Package at an ID Firm in TradeHub 21. Resale HDB 5-room Apartment for Kitchen & 2-Toilets, at $16,800. This offer includes hacking of old tiles on floor & wall + new waterproofing. Was told they are a new branch and offering cheap now. Showroom around 1500sq.ft. If interested can PM you their Package. those packages normally have a lot of missing items, like kitchen cabinet includes only 10 ft while you actually need 20 ft. so after adding all those, probably close to 19k liao
March 10, 201115 yr thanks papayeo! Can you pm me the package info? Sorry, tried but still dont know how to PM, lol. or can you PM me your email instead? Sorry.
March 11, 201115 yr Author those packages normally have a lot of missing items, like kitchen cabinet includes only 10 ft while you actually need 20 ft. so after adding all those, probably close to 19k liao Exactly! Headache. The ID quotes me 40ft for the kitchen cabinet - for top and bottom. But when i check with other IDs, the kitchen is at most going for 30ft, minus off the area for fridge. So he his quote doesn't seems to provide a more accurate measurement.
March 12, 201115 yr U can see my T-blog for what I have done, and it cost a total of $37K. For toilet and kitchen, i just calculated those portion from my quotation and amounts to about $15K.