Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Group A&a, Rebuilding, Buying Of Materials (May The Force Be With Us!)

Featured Replies

  • Author
On 18/01/2016 at 11:04 AM, jasling said:

hi,

i am about to start my a&a for my semi as well. just confirmed my archi, PE and contractor. now looking for carpenter.

for my a&a, my total budget is $490K including all archi, PE, changing our all 7 toilets, fixtures and lighting (excluding electrical equipment). i am extending my attic to full attic (metal roof), reconfiguration of rooms, extension on the ground floor and building a mezzanine.

if you keen, i can provide the quotation list and contact.

Thank you.

I also building a mezzanine....   how did you design your air conditioning since the ceiling is so high?

  • Replies 39
  • Views 12.7k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • hi, i am about to start my a&a for my semi as well. just confirmed my archi, PE and contractor. now looking for carpenter. for my a&a, my total budget is $490K including all archi, PE, changin

  • Hi Jasling, Appreciate you can share with me your quotation list and contact. lee.alice.sg@gmail.com Thankyou very much

  • Author
On 11/01/2016 at 9:13 PM, CCK1698 said:

Bro. I think you had all things a bit mix up. When doing A/A for my house, the actual process is to engage an architect first, not ID. My consultant design for our house then engage ID to do space planning and interior design. Upon construction begins, have them group up to coordinate your construction and renovation process so that you no need to spend extra money paying for VOs.My builder and ID works well as they are under same company. Getting an inexperience ID will cost you spending $ as some are inexperience in building regulations.My builder , Willy and ID Mr. Chua is the cheapest during the tendering and their service is prompt and good. If You are interested, you may drop me your email and I can recommend him to you. Going to China, especially Guangzhou, to buy your stuff will be a good idea as things over there are super cheap. We bought our lights, curtains and some tap wares and import for our house and really save a lot. You will save at least $20-30k.

haha... you're right!  I did the reverse. It was tougher because the facade kinda look a little off after the ID has his go on design first. But the good thing was everything was design according to how I would use the house, and then we adjust the facade later. I got an independent ID because my belief was any good designer would strike out on their own eventually. So I think I paid a bit more for my ID. 

Btw, how is your house going now? wanna chat in private? Give me some tips leh... 

  • Author

those on this thread...  are you guys keen to join me in a private Facebook page discussions? 

  • 2 weeks later...
On 12/28/2016 at 0:17 AM, serangoony said:

those on this thread...  are you guys keen to join me in a private Facebook page discussions? 

Hi serangoony, please put me on your Facebook page discussion.  I am in the mist of engaging a D&B company to reconstruct my house.  I will PM you my contact details.

Thank you.

  • 1 month later...
On 11/01/2016 at 9:13 PM, CCK1698 said:

Bro. I think you had all things a bit mix up. When doing A/A for my house, the actual process is to engage an architect first, not ID. My consultant design for our house then engage ID to do space planning and interior design. Upon construction begins, have them group up to coordinate your construction and renovation process so that you no need to spend extra money paying for VOs.My builder and ID works well as they are under same company. Getting an inexperience ID will cost you spending $ as some are inexperience in building regulations.My builder , Willy and ID Mr. Chua is the cheapest during the tendering and their service is prompt and good. If You are interested, you may drop me your email and I can recommend him to you. Going to China, especially Guangzhou, to buy your stuff will be a good idea as things over there are super cheap. We bought our lights, curtains and some tap wares and import for our house and really save a lot. You will save at least $20-30k.

Hi CCK, can u pls PM me your contact Willy and Chua? 

 

Also, where do u go in GZ to buy your stuff?

Hi Serangoony, how is the progress of your works? And how do we find you on FB?

Hi, I am interested in your FB discussion.  We'd engaged a architect to design our house, its in the designing stage, confirming next week, the architect will get all the drawings out for submission.

Put me in your discussion. Thank you.

  • 3 weeks later...

Hi all, my architect is currently drawing out the floor plans for our confirmation. Still in the beginning phase of rebuilding. Will be interested to be in the FB discussion! 

Thank you 

 

 

  • 2 weeks later...
  • 2 weeks later...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.