Everything posted by jaskel
-
The Journey To Our New Home
Oh Freddy called me to arrange the date of installation and i asked him when u coming to choose the layout. That's why I'm there so that to see and understand more of his layout on whether will its crashed with the work and design not. Oh btw, today met Alex and he will be changing the windows for the balcony. Although he told me that he will talk with you, but I had insisted him to change and do it to what I wanted hope this doesn't add up to your burden(u can tell him u leave it to me and everything arrange it with me also can). That wall will not be painted until he replaced the window even tot it will cost me more to ask the painter to come another day to finish up the job.
-
My Little 2+1 Process Begins....
Anywhere, just let me know in advance so that i can schedule my timetable. Thanks. Maybe can arrange a 'meet the house owner' session just like the PAP. So anyone need some advise also can join in.
-
Sharing Of Renovation Journey - With Designstreet
Who said no one use diamond drills bits in this industry? Not only for homo tiles, marble, granite, can be use for ceramic tiles too. This is to prevent the tiles from cracks especially when drilling for bathroom accessories. Is good that u asked to lay another layer of water proofing membrane as the initial water proofing had been damaged by the plumber.
-
Can Renovation Start During Chinese Ghost Month?
Can start before the 7th month(but need to choose a good date to start hacking), then during the month doing reno no problem.
-
Is $15,500 Too Expensive For Kitchen Reno?
If I do have time, I'll give u a clearer pics of the quote and actually, I do feel that the quotation reasonable.
-
My Little 2+1 Process Begins....
no stupid question la...becos u all are not in this trade, that's why a lot of things either not understand or don't know at all. Whatever questions asked, I'll try to answer to my best knowledge, I'm also learning a lot from the house owners themselves such as how to improve in services, where got good bargains, sales, etc...
-
My Little 2+1 Process Begins....
...join join...then any questions can ask me on the spot.
-
A 9mths Reno Journey
When selling your unit, HDB will come and check for any illegal works. As long as all works are done under HDB rules and regulations, the inspector will not stop your 2nd appointment from going thru.
-
Seriously Need Help On My Sewage Pipe
Call your town council. Their plumber will do.
-
A 9mths Reno Journey
Hi emobebe, This is a bit too hard to answer so openly here.....by right under HDB terms and conditions; 1. All wiring installation work must be executed by an EMA licensed electrical worker 2. Embedding of wiring house in metal/high impact PVC conduit in RC slab, beam, column, wall and in wall plaster or other finishes is not allowed 3. For all types of flats, diameter and penetration depth of power-driven nails/screws must not exceed 6 mm and 40 mm respectively 4. For flats with concealed electrical wiring (original provided by HDB): a. Please refer to guidelines in sketch Drawing 1 "Drilling of holes in flats with concealed electrical wiring" 5. Precautionary measures should be taken to ensure anchors (including hammering of nails) into the slab are located away from the concealed conduits as shown in the concealed conduit layout plans 6. Upon completion of the work, the flat owner shall apply to SP Services Ltd for testing through his Licensed Electrical Worker. Engaging a EMA licensed electrical worker is much more expensive.
-
The Journey To Our New Home
Oh...I'm really sorry about that. I think for the month of March and Apr, I've been meeting too many house owners that I really can't cope at all. Anyway, recently had found a way to reduce the time for house owners on waiting for my quotation, that is to quote on the spot. I think Wenx also waited 1 mth then received my quotation. If u r willing to forgive me and give me a chance to meet up( will take ard 3hrs), I'll give you the quotation on the spot. My style of working is always attentive to the present house owner first than potential customers. Hope everyone can understand. Moreover now I'm not going to entertain to those who send me floor plan and ask me to quote by mail. I do prefer in meeting up and discuss. Really really sorry for those that I've forgotten, I will change and improve this shortcoming of mine.
-
Supreme Laminate Floor Warranty
What your company name?
-
Kronotex Or Supreme For Flooring
What your company name?
-
The Journey To Our New Home
If u all are referring to the black tape over the frame of the windows panel, those are used to protect the framework from being scratched during installation. It will be tear off after the renovation is completed.
-
The Journey To Our New Home
Actually when I went up your place to check on the work progress....the first look of the window already loo a bit weird...becos of the alignment of the windows panels. So look a bit closer was there a V gap at the corner....I was like..hmmm....how to clean even my small finger can't reach till the end.
-
Unforgettable ~~
The different in thickness of the shelving and TV console do made the whole look.....a bit weird
-
Id Refuse To Provide Quotation
jaskel replied to sneaky_ho's topic in Renovation Contractors, Interior Designers & Suppliers ReviewsNo la...your thread is still "alive".
-
Unforgettable ~~
3" is a bit too big....he may be thinking u want to put gold bars on top
-
The Journey To Our New Home
Dont worry....leave everything to me
-
A 9mths Reno Journey
U still have my no. right?
-
Unforgettable ~~
Wen Wen, if u read on the 1st post and u will know that he didn't engage ID note for the reno.
-
Help Needed!
Why in the first place will u sign up without even having to look at the quotation yet. In this case, just ask the ID to do up the kitchen package that it offer will do. The rest look for another ID or contractor to do it.
-
Anyone Could Help Me Please? I Am Stuck Now...
jaskel replied to listensea's topic in Renovation Contractors, Interior Designers & Suppliers ReviewsI don't think so, if they don't want to do, they might as well don't quote.
-
The Journey To Our New Home
A search for the blue pills here and u will know what I mean
-
Anyone Could Help Me Please? I Am Stuck Now...
jaskel replied to listensea's topic in Renovation Contractors, Interior Designers & Suppliers ReviewsMaybe u took too long to decide and the last slot had been signed by another house owner...this is a first come first serve basis for those who are responsible for their works. They do not want to signed first then delay the project which will not be nice for both parties in the end. I don't think that anyone will check with every customers to tell them whether they can sign with other customers or not(won't it be funny if the contractor/ID call u and ask r u going to sign with me if not, I'll sign with other on the spot now with other house owner and I can't take your project anymore. What will the other house owner think if they were there?) Hope u can find someone soon to help u on your reno.