  1. Ur videos set as private, can't access. Can u pm me ur kitchen door quote n contact? Thx
  2. hi, painting is ongoing now, not sure if they applied primer. but u can either use primer or use more coats of paint.
  3. woot this is cool! how i wish i got both side windows for the kitchen, ur kitchen will be bright!
  4. Yes, 2.65m3 actually but oops.sg charge per 0.1m3 ($5)Gas is one time for pipe, another time for stove. Tiles? Can't check yet since it's all covered up.
  5. City gas came today to extend the gas pipe for stove, extended into service yard through HDB provided opening from top of service yard door turn down and enter kitchen again terminate at proposed stove location tmr will be painting of whole house + carpentry measuring
  6. ceiling gap for living room aircon installation box up for all aircon piping in the corridor MBR aircon pipe box up, got a pointy corner =\ ID say if wanna hide goto lower the whole beam
  7. went in for some progress photo, greeted by the partition wall, this pic just show the clearance between the main door n partition wall when fully open, i hope no problem when delivering furnitures. behind this wall will be dining area, reason built this wall is firstly for fengshui (no direct view to windows/door), 2ndly cos i bought a 2m dining table, too long cant fit anywhere, lastly to install the dining light switch on it false ceiling up to hide all the ugly lighting points and in-ceiling speaker. did L-box instead of cove light, didn like the idea of cleaning view from corridor ceiling with 6" gap near the window for double curtain tracks later, i didn wanna install the curtain below existing window beam as i think it will make my unit look shorter than it already is
  8. measurement done for false ceiling, materials on site. had a discussion with ID on the opening size, location, lines etc... collected KDK fan from my friendly neighbour who bought for me from JB opened one of the box, 2x Aames chair Evorich guy came to do measurement for my bedrooms, he suggested to me that i should do carpentry (wardrobe) first then they can lay HERF vinyl, this prevent scratching done by carpenters and also can reduce the area needed to lay vinyl, save some $$$ however, upon checking he told me that my bedroom entrance screed is not levelled, some area 5mm, some 3mm, to my horror he told me the HERF is actually 5mm not 3mm..WTH! the sales clearly told me its 3mm & asked me to offset 5mm for adjustment... but he also said that it can be resolved with a pvc bridge over...so...i hope everything turn out nice... so buyers of HERF beware...its 5mm thick not 3mm..and i think having offset of 7mm is a safer bet... we chose the Amsterdam eggshell white as i think it is more close to our theme.
  9. tiling finally completed after 2 months...i chose a ramp instead of step for the entrance...for old folks not sure its the kitchen tiles not level or my living room tiles...the gap seems uneven...goto ask tiler rectify it. 2.7m3 of taobao stuff delivered lights, sinks, taps, chairs...etc MBR toilet tile redo completed but... silly mistake by tiler again...the shampoo ledge is too close to the rain shower tap...i cant even install the hose or even put shampoo bottles...goto redo...again new feature tile is definitely straighter than the old one...love it will be using white grout for the gaps next up, carpentry works and false ceiling..cant wait!
  10. Screed is basically a level finishing before u lay ur tiles/parquet/vinyl etc. it's a sand n cement mix. usually contractor mix cement & sand to a certain ratio (1:3-5, w/wo aggrevates depend on the application) concrete is the one added with bigger aggrevates (small size stones) Prepack screed only means that sand/cement already mixed properly in the pack, contractor no longer need to mix using mixer on the spot New requirement in place to make sure the mix is even & to requirement. Will cost higher. If u request for HDB screed they will use prepack screed. Starting next month Reno contractor goto use prepack as well for all flooring works. HDB only give u foc screed if u laying laminate/parquet/vinyl but not tiles
  11. new tiles finally arrived tiling work finally resumed, removing old layer of feature wall at MBR toilet choose a setting out plan so the tiles layout is more pleasing to our eyes.
  12. hi, is it difficult to route the pipes if put the storage in the service yard?
×