Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Advice! What To Expect For 2 Toilets & Mbr?

Featured Replies

Hi guys, wondering if I can get any kind advice on the kind of quotations I willi be getting to mentally prep myself first?

I'm entasked with the wedding & reno preps as fiance not ard in sg. Am afraid I become carrot head let others chop. I'm working around a tight budget and these are the items I'll like to have redone:

- kitchen toilet - change tiles, basin, toilet bowl

- MBR toilet - change tiles, 2 basin, toilet bowl, shower door

- MBR + 1 room - hack wall, re-tile, walk in wardrobe, platform bed

- living room - feature wall

******

What do you tink is the timeframe for completion for the works above?

i will like to know also hacking of wall neccesarily means involve to retile the whole area?

changing of kitchen cabinets doors is as good as changing everything?

If I get ID to design, will I get to keep the drawing as reference?

Thanks in advice for any replies!

I need a "renovation for dummies"!! =(

Edited by happysnowball

Do note the moment you want to re-tile your walls, it is not going to be cheap hor.

Time frame should be at least 2 months.

Yes, you can keep the drawings provided you are engaging that ID to do the work for you.

for mine in my existing flat

1) kitchen toilet - change floor & wall tiles, basin, toilet bowl, door, window, all accessories, stainless steel pipping, floor trap, install a 15L storage heater, paint ceiling

2) MDR toilet - change floor & wall tiles, basin + toilet bowl + door + all accessories, panel, stainless steel pipping, do a kerb, new floor trap.

3) MDR - plaster wall and ceiling, repaint wall and ceiling, additional power points and additional lightings points,

- dismantle window grill (less than 30mins) and hack the old built in wardrobe

total including lightings, new switches and toilet stuff - 13k

time taken : 15days

cleaning : 7days

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.