Hdb Resale Ea Unit At Kang Ching Road

Featured Replies

  • Author

Sorry for not updating my Blog. Lost count of the number of days already .....

Progress:

New Wall - done

Foor Tiling & Wall Tiling - done

Windows - done

Air-Con - trucking done

Next 1-2 weeks:

Electrical Works

Ceiling Works

Relocation of OpenNet

Running of Gas Pipe

Piping Works

Items need to be purchased:

Lights & Fans

Curtain / Roller Blind

  • Replies 186
  • Views 34.1k
  • Created
  • Last Reply

Top Posters In This Topic

  • Author

Just came back from *** (thry my ID). Total damage closed to $3K for lights (whole unit) & fans (5 ceiling + 2 wall).

Also obtain quotation from them:

Full Ht Curtain - $1,800 (approx 9m run)

Half-Ht Roller Blind - $1,800 (approx 10m run)

  • Author

Progress:

New Wall - done

Foor Tiling & Wall Tiling - done

Windows - done

Air-Con - trunking done

Ceiling Works - done

Plumbing - done

Wiring - done

Next 1-2 weeks:

Painting, (Date: 3 - 6 May 11)

Installation of Lights & Fans, (Date: 5 - 6 May 11)

Relocation of OpenNet, (Date: 5 May 11)

Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)

Installation of Cabinet, (Date: 14 May 11)

Installation of Doors & Gate, (Date: 14 May 11)

Installation of Solid Top, Hob & Hood, (Date: 21 May 11)

Recent purchased:

Curtain / Roller Blind - e-Curtains Trading, installation date: Sat 21 May 11

Planned move-in date:

Sat 28th May 2011

Edited by st96

Bro Sunny

Wow...lookalike these 2 weeks will be crucial period where most activities take place.

By the way, noticed your OpenNet schedule i. 5 May. When did you make the appointment with them? Seems like you have a shorter waiting period since reno starts.

I recalled I have to wait for 2 months for OpenNet to come to relocate the TP box!!

Progress:

New Wall - done

Foor Tiling & Wall Tiling - done

Windows - done

Air-Con - trunking done

Ceiling Works - done

Plumbing - done

Wiring - done

Next 1-2 weeks:

Painting, (Date: 3 - 6 May 11)

Installation of Lights & Fans, (Date: 5 - 6 May 11)

Relocation of OpenNet, (Date: 5 May 11)

Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)

Installation of Cabinet, (Date: 14 May 11)

Installation of Doors & Gate, (Date: 14 May 11)

Installation of Solid Top, Hob & Hood, (Date: 21 May 11)

Recent purchased:

Curtain / Roller Blind - e-Curtains Trading, installation date: Sat 21 May 11

Planned move-in date:

Sat 28th May 2011

  • Author

Progress:

New Wall - done

Foor Tiling & Wall Tiling - done

Windows - done

Air-Con - trunking done

Ceiling Works - done

Plumbing - done

Wiring - done

Relocation of OpenNet - done

Installation of Doors & Gate - done

Next 1-2 weeks:

Painting, delayed and only start on Mon 9 May 11

Installation of Lights & Fans, delayed and only start on Mon 9 May 11

Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)

Installation of Cabinet, (Date: 14 May 11)

Installation of Solid Top, Hob & Hood, (Date: 21 May 11)

Installation of Curtain, (Date 21 May 11)

Planned move-in date:

Sat 28th May 2011

  • Author

Some Photographs:

Main Entrance

Progress013.jpg

Living Room (Wall for TV Console)

Progress008.jpg

Entrance to Bedrooms

Progress007.jpg

Master Bedroom Toilet

Progress004.jpg

Progress005.jpg

Edited by st96

Wow...Bro

I like the wall tiles in your master toilet, and the sink is unique!!

Some Photographs:

Main Entrance

Progress013.jpg

Living Room (Wall for TV Console)

Progress008.jpg

Entrance to Bedrooms

Progress007.jpg

Master Bedroom Toilet

Progress004.jpg

Progress005.jpg

Edited by mae29

  • Author

Progress:

New Wall - done

Foor Tiling & Wall Tiling - done

Windows - done

Air-Con - trunking done

Ceiling Works - done

Plumbing - done

Wiring - done

Relocation of OpenNet - done

Installation of Doors & Gate - done

Painting - done

Installation of Lights & Fans - done

Outstanding:

Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11)

Installation of Cabinet, (Date: 14 May 11)

Installation of Solid Top, Hob & Hood, (Date: 21 May 11)

Installation of Curtain, (Date: 21 May 11)

Planned move-in date:

Sat 28th May 2011 (Mover: 138 Professional Movers)

Shall take some photographs to share .....

We have the same sink!! It's nice, right?

It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place.

HMmmm how come I didn't see this sink during that time :(

It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place.

HMmmm how come I didn't see this sink during that time :(

When u come on 21at, you can have a look. Took me a while to look for sinks too. But managed to find this which I quite like but not cheap lah.

  • Author

It is a nice sink...the depth is deep so water won't splash everywhere. My colleague gave me his advice to buy sink with wide 'mouth' & deep enough when I was renovating my place.

HMmmm how come I didn't see this sink during that time :(

It is nice to know that both May & Mae like this sink too! Yes, I chose this sink becos of it depth.

Mae, I thought both of us purchased from the same shop!?

It is nice to know that both May & Mae like this sink too! Yes, I chose this sink becos of it depth.

Mae, I thought both of us purchased from the same shop!?

Bro,

I think my eyes got stamps lor....didn't see this sink while I was there choosing. Maybe I was browsing for sink with cabinet first & overlook this sink. I remember I only saw the normal ones but not like yours.

Bro, how much you pay for that sink? How about your common toilet? Same design?

  • Author

Identical WC & Basin & Heater for both toilets. Except the colour schemes are difference.

These are normal "GEO" products:

WC - $400 each bf GST & bf discount

Basin - $200 each bf GST & bf discount

"707" Princeton instant Heater - $300 each bf GST & bf discount

Identical WC & Basin & Heater for both toilets. Except the colour schemes are difference.

These are normal "GEO" products:

WC - $400 each bf GST & bf discount

Basin - $200 each bf GST & bf discount

"707" Princeton instant Heater - $300 each bf GST & bf discount

How much after discount then?

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.