Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Featured Replies

  • Author

We arrived at the block about 9.30am to see our carpentry delivered and stored at a corner of the void deck! It was packed very compactly and neatly. Heard from my neighbour who has shifted in that he saw it being unloaded at about 7.10am in the morning!

20140519_092744_Android_zpsed3edf31.jpg

The workers arrived at about 10.30am and soon got to work. 4 of them.

20140519_153351_Android_zps12e35575.jpg

With about 1/4 of the carpentry inside the flat

20140519_153413_Android_zpsf5919d31.jpg

20140519_153500_Android_zpsca986a9c.jpg

There were still so many outside in the corridor!

Edited by harocarlos

  • Replies 190
  • Views 291.8k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • harocarlos
    harocarlos

    oh my ID didn't take those photos.. lol.. here's afew more i took with my Note 3 at night..

  • harocarlos
    harocarlos

    During the long wait, I've been playing around with floorplanner.com to plan our desired layout for the flat. As the master bedroom was really small, one of wifey's "must-have" is a wardrobe length of

  • harocarlos
    harocarlos

    Kitchen Sink/Faucet Blanco Pleon 8 and Blanco Linus Faucet in White from Hoe Kee - Genting Road

  • Author

20140519_153509_Android_zpsebd47d79.jpg

This is the kitchen cabinet at the breakfast/bar counter side. We're using excel drawers for the whole house and blum hinges and blum aventos for the dish rack.

20140519_153519_Android_zpsfbc73c22.jpg

close up of the drawer track.

20140519_153044_Android_zps18312e56.jpg

my study table coming to shape!

20140519_154821_Android_zps84579b7e.jpg

common toilet storage mirror and vanity

20140519_155233_Android_zps12579729.jpg

bedside tables used as their planning desk temporarily

Edited by harocarlos

This must be the most exciting stage!

The house is materialising in front of you :)

The whole house will be in a different look once the carpentry is up.

Hope to see more updates once they are done

  • Author

Day 2 of carpentry work after citygas came to run the gas pipe in the morning..

20140520_151632_Android_zps3eaaa854.jpg

Slight cockup as the gas outlet ended a little short of mark. Will be rectified tomorrow..causing a delay as one side of the kitchen carpentry cannot be installed today for kompacplus to be measured..

20140520_151622_Android_zps8dace322.jpg

The other side of the kitchen cabinets are up...

20140520_093318_Android_zps532e1e11.jpg

Wardrobe and study table up yesterday... wifey keep complaining that my study table's depth is overkill... 750mm to be exact including the cable management slot... i love big working desk =X

20140520_183503_Android_zps6f01a735.jpg

Bedhead and side tables completed today...

  • Author

We will be engaging MGL Curtain tomorrow for our blinds...MBR will use roller blinds and the rest of the house timber blinds...

Very nice. I realised that you did not build be kitchen cabinet cement base?

Day 2 of carpentry work after citygas came to run the gas pipe in the morning..

20140520_151632_Android_zps3eaaa854.jpg

Slight cockup as the gas outlet ended a little short of mark. Will be rectified tomorrow..causing a delay as one side of the kitchen carpentry cannot be installed today for kompacplus to be measured..

20140520_151622_Android_zps8dace322.jpg

The other side of the kitchen cabinets are up...

20140520_093318_Android_zps532e1e11.jpg

Wardrobe and study table up yesterday... wifey keep complaining that my study table's depth is overkill... 750mm to be exact including the cable management slot... i love big working desk =X

20140520_183503_Android_zps6f01a735.jpg

Bedhead and side tables completed today...

  • Author

Very nice. I realised that you did not build be kitchen cabinet cement base?

yup, no cement base for kitchen as we will never wash the floors. It will just be supported by legs like those Ikea kitchen cabinets

Edited by harocarlos

Hi, is your corridor track light using led? What's the walt you used?

Thanks!

We've began installing some of the lights, others will need to wait for carpentry to come up.

corridortrack_zpsdd3eb2b8.jpg

Corridor track light

haiku_zps3dc70191.jpg

Haiku fan is up!

ikealight_zps93be5817.jpg

IKEA's mini tracklight at the main entrance. Wifey feels that the "track" should be rotated 90deg to look better, what do you think?

20140512_145956_Android_zps7ce27dc2.jpg

Replica Tom Dixon Beats @ Bar/Breakfast Counter

  • Author

Hi, is your corridor track light using led? What's the walt you used?

Thanks!

Yes, all lights are LED except the Tom Dixon Lamps and some T5 tubes later on. If I remember correctly, its 3w each.

  • Author

20140522_101522_Android_zps2d4445e1.jpg

Wardrobe completed

20140522_101536_Android_zpsf7047dd6.jpg

Study table left the laminate on the table top and the metal legs.

20140522_183927_Android_zpsaacec531.jpg

Subway tiles in progress..will be all the way up to the ceiling.

20140522_183939_Android_zpsa7307e69.jpg

The sink side.

Edited by harocarlos

  • Author

20140522_183750_Android_zps1e4e1333.jpg

20140522_183803_Android_zpsed2b72de.jpg

Suspended shoe cabinet and console cum settee is up! The feature wall is not yet secured thats y its leaning at an angle...cant wait to see the laminated look of it!

20140522_184158_Android_zpsaeba185b.jpg

The btm part is done, so can have an idea of the look?

  • Author

Checked with the carpenter at the end of the day if they can finish everything tomorrow. He shook his head and replied, "Either Monday or Tuesday then can complete". Schedule is really tight now and I'm not sure if Kompacplus can meet the schedule as they have yet to fix an appointment to do the measurements. After which, they require about 1 week lead time. Problem is, I'm moving in next Sunday! without the Kompacplus, the toilet sinks/taps and kitchen sinks/taps can't be installed. I would have to use water from shower only -_-

Edited by harocarlos

  • Author

Forgot to upload a pano shot of the living room I took yesterday...from the corridor...

20140522_180633_Android_zps8ddef7f3.jpg

20140425_164911_Android_zps3fc47a95.jpg

Cement screeding of a small portion of the kitchen wall and the beam in progress.

20140424_153419_Android_zpsd641f2be.jpg

Washing machine base.

CommonAlcove_zpsec0c1a67.jpg

Common bathroom alcove wall.

MBRAlcove_zpsf0bac4bb.jpg

Master bathroom alcove wall. The aircon trunkings seen here will be hidden as we will have false ceilings in both the toilets.

Hi Harocarlos,

Fellow Ancillian here. :) Looks like your reno is going well! Great looking place. I am curious about what type of heater you use and how you manage to hide it since the outlet/inlets are quite low. Thanks in advance!

Edited by nickguthe

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.