Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

~ Our Journey To Somewhere We Belong ~ A Place We Call "home"

Featured Replies

the 50k does not include the kitchen appliances, aircon, toilet kitchen accessories and lights.

My 5rm Reno about 52K

  • Replies 30
  • Views 9.8k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • $2388

  • Progress of 2nd day carpentry Kitchen top and bottom / with Island + top hung tempered glass kitchen sliding door track Tv feature wall The wood on the left below I forget is to install the mirror o

mine is a 4 room resale and i am not even replacing the room parquet and living room homogenous tiles... my quote is 50+ before electrical... sigh...

Hi joann

Your 3d drawing is very nice.. can share to me your id contact?

  • Author

mine is a 4 room resale and i am not even replacing the room parquet and living room homogenous tiles... my quote is 50+ before electrical... sigh...

Sign nowadays everything also expensive. You must have a lot carpentry?

  • Author

Hi joann

Your 3d drawing is very nice.. can share to me your id contact?

Have Pm'ed you Tampan.

  • Author
:angry2: Many things cork up this week. It is a bad bad week!
First, it was the Viewqwest. Signed up with them for Bundle 300. They confirmed with email for installation of opennet to be fixed on 19 May but no one came and it was not even in their system. So I rang them up and $^*#%^&@$^#$^&@. Hehe they gave me speed boost 3 months for their overlook in the matter. The new date for opennet installation is fixed on 29 May Thursday. Delayed my reno abit.
Second was my aircon from Mega Discount Store. Arranged for Aircon on 20 May, and no one came. End up I call Mega and overheard that Mitsubishi overlooked. Okay but they arranged for Thursday 22 May. That was fast. :) Settled.
Thirdly, Mega Discount Store again. Delivery was supposed to be on 16 May but claimed that EF agent computer system down so couldn't deliver on 16 May and changed to 19 May. But no one will be at site on that day cause all completed just pending for carpentry and lights. So, I changed to Saturday 24 May 3pm to 5pm where I will be around to receive the Hob. EF agent will deliver the Hob back to Mega store cause EF agent don't work on Saturdays. Purposely went there to wait at 2.30pm and wait wait wait. Guess what? No one came. It was so hot and no chairs to sit. I called Mega Discount Store at 5pm to check, they tell me the EF agent sent it to their store and not warehouse. So, wasted the whole of my afternoon! Angryyyy! End up delivery fixed today afternoon. I must get them to compensate me with something for their cork ups twice. :notti:

To replace Gate

Pending to replace Gate

Aircon trunking is concealed in master BR toilet

My Aircon trunking is concealed in the Master BR toilet

Common BR 10VA is up!

Common BR aircon is up and running

Master BR 10VA is Up!

Master BR Aircon

Living Room 24VA Aircon is Up!

Living Rm 24VA

My ID says today is Carpentry day! Wonder if I should pop by in the evening... I'm so excited! The Completion date is near!

My carpentry not a lot ..

Shoe cabinet 1.6m

Kitchen cabinets top and bottom...

Tv console

Wardrobes 3.2m

Toilet vanity x 2

That is it? I wanted more but can't afford

Sign nowadays everything also expensive. You must have a lot carpentry?

  • Author

I just pop by and have a peek! Camera no flash >_< too dark to take photos.

Feature wall

Progress: 85%

Wardrobe

Progress: 80%

Study Table

Progress : 95%

Master Bedroom storage under window

Progress : 50%

Master bedroom toilet vanity

Progress : 0%

Top & Bottom Kitchen cabinets

Progress : 35%

Kitchen Island

Progress : 50%

Rem to check the internal of the carpentry which I heard usually they will not put silicon as it is not seen

By the way mind taking a pic of the feature wall when its convenient ?

  • Author

Progress of 2nd day carpentry

Kitchen top and bottom / with Island + top hung tempered glass kitchen sliding door track

gallery_58084_366_23293.jpg

Tv feature wall

gallery_58084_366_3456.jpg

The wood on the left below I forget is to install the mirror or laminate. LoL!

Master bedroom storage, pending laminates.

gallery_58084_366_18458.jpg

Wardrobe almost completed

gallery_58084_366_5599.jpg

Study Table, pending the installation of drawers

gallery_58084_366_31108.jpg

Edited by J0ANN3

Good progress on the reno. :good:

Starting of carpentry is the most need to check but also another milestone journey .

  • Author

Rem to check the internal of the carpentry which I heard usually they will not put silicon as it is not seen

By the way mind taking a pic of the feature wall when its convenient ?

silicon? Put where which part of internal? Im a total newbie in all these stuff.

silicon? Put where which part of internal? Im a total newbie in all these stuff.

Example those back piece joint part, flooring and carpentry joint part, and etc.

  • Author
Updates - Mirrors & Glass doors up - Countdown to 12 June


Study table done


Kitchen cabinet


Mirror for dining


Wardrobe done


Vanity

  • 4 weeks later...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.