Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

enz

Members
  • Content Count

    100
  • Joined

  • Last visited

Everything posted by enz

  1. storeroom...led goes off when light is on took me 2 hours to change this alone... 4 gangs switch is too expensive, and cable too messy...decided not to change at all.
  2. master toilet kitchen living room very hard to replace storeroom
  3. hi, very long nv come back here to update anything. I've just recently changed my light switches to big button types. took me 6hours, but i quite like the change! the old switches! bedroom 1 bedroom 2 living room master bedroom
  4. Is this bigger ? We are getting rid of some items in the list. Very shocked about the price too.
  5. Hi guys i just got the quotation from my interior designer. Just wondering if anyone of you can give me advice on this. Thanks Page one of quotation
  6. any help on getting rid of mosquitoes??..burnt kambongyan and mosquito coil + a liquid vaporizer that connects to electric but still a lot of mossies. the "blue light lamp" got use or not huH? now waiting for nea to arrange appt to come inspect.
  7. air bubbles on wall normally is the paint cannot stick well to the cement. so if just air bubbles, what i do is to scrape off all the paint that can be scraped, then apply wall putty. if not flushed with the wall, then apply another coat of wall putty. after it dry, sand it smooth. then apply a few coats of paint to cover up. if bubble contains water, means outside the cement got cracks liao so water seeps in when rain. if that happens, call up ur town council to patch up the crack, den scrape off the paint and apply wall putty.
  8. so big a scratch sure can see la... let him do his stuffs..he never rectify den dun agree to the handover loh. think most prob the tile got to change, but no problem with that as tilers can change tiles quite professionally. i have a few tiles oso retile, cant even tell the difference.
  9. Yes i agree. i live in the same area but on Yung An road opp CC. i think the killer for me is the CC, my god the events they had all goes well into the night on the weekends. Dunno why this CC very happening.
  10. one more update. my curtains are finally done, after 1 mth of moving in. cos very lazy to go and look for curtain. cedric did it for me, and the effect is rather nice. my living rm wooden venetian blind bedroom 1 curtains bedroom 2 curtains my wife's friend bought this for us during her trip to japan, finally i found enough materials to hang this up at our kitchen doorway. BUT the hangers gave way this morning. haiz not sticky enough. think got to either nail or put more hangers.
  11. spam chop...no need to think very much, just hack everything. but how come so much tiles one ah? outside of kitchen oso got tiles.
  12. i bought them at shanghai tong lee shop, somewhere near lavendar. if im not wrong, opening hrs are mon-fri till 5pm, sat till 3pm.
  13. Hello, time to give the last few updates to my blog before i move in. some picture updates. my mbr with the expensive mattress and bed. pasting that cherry blossoms on the walls nearly killed my wife and me! tore a few pieces but lucky still ends up quite well. my mbr curtain that is bought from bkk mbr relax corner. mbr shower screen bought from bkk my living room tatami, a little messy cos we havent really clear things up yet. living room painted wall. forgot to take another wall where we painted another picture on it, i'll leave it to next update living room 3X3 divider from scanteak. bedroom 2, a little blank at this time cos wife wana grow plants here. bedroom 1, guest room with bed. dunno what to do with that table on the extreme right. anybody wana buy? main door + gates. kitchen cab with stickers pasted. f&p washing machine + fridge finally going to move in soon. hope wun get delayed again.
  14. thks for the reply. its a wooden door. i already gave up, so i just sand down the base coat to make the bristle lines less obvious, and cover up with 1 coat of oil-base type glossy paint. although still a little "liney", but i already very sianz doing that stupid door already.
  15. why not PVC all the way? looks strange like that with metal joining plastic.
  16. 1) alter tables i think bugis there has a lot, opposite the fu lu shou building 2) main door should cost about $800 onwards, depends on wood / fire-resistance / size 3) you are talking about main door iron wrought gates? i got mine at $385.
  17. shld be cheaper, but not necessary to your liking.
  18. hi i've stripped away a layer of paint from the door, and applied this "quick dry base coat" (paint shop auntie recommend) on the door. but i applied using paint brush and i can see the base coat not even, with lines (like the brush bristles) running all over on the door surface. applying paint on this liney surface can still see these lines, so what should i do now?
  19. normally piping should be along the floor ba.
  20. Not really if it is a minor reno, 3 weeks is realistic. Mine was around 3 weeks.
×