Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
seng55

Our Little Abode @ Pinnacle

Recommended Posts

Hi All,

This is our first house and we will like to share our joy & experience here.

Hubby & I took went through quite some effort in our search for ID. We eventually choose Sunny from Baroque D.Zign over the others as he is responsive to our queries and is patient in listening to our requirements. We also went to one of his showflat and are pleased with the workmanship. Most importantly, he is someone whom we think we can build good rapport with.

ID: Sunny From Baroque D.Zign

Feng Shui: Master Tan From Way OnNet

Theme: Simple Modern

Start of Renovation: 03 May 2010

End of Renovation: 19 June 2010 (estimated)

Our Journey:

02 Mar 2009 - Selection Of Flat With HDB

06 May 2009 - Signed The Agreement For Lease With HDB

05 Feb 2010 - Collection Of Keys From HDB

10 Feb 2010 - Initial Opening Of Door For The 1st Time

11 Feb 2010 - Feng Shui Master Visited House For Assessment

27 Mar 2010 - Signed Renovation Contract With Baroque D.Zign (Sunny)

22 Apr 2010 - Conducted Ceremony To Commence Renovation

23 Apr 2010 - OpenNet Installation

03 May 2010 - Start Of Renovation

Edited by seng55
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Here are some of the pictures of our house before any reno work is done.

Floor Plan

FloorPlan_Resize.jpg

View From Entrance Into House

Foyer01.jpg

Living Room

Hall.jpg

Bomb Shelter

BombShelter.jpg

View From Hall To Kitchen

HallToKitchen.jpg

 

Share this post


Link to post
Share on other sites

Master Bedroom Toilet

MBRToiletSink02.jpg

MBRToiletBowl02.jpg

MBRToiletShowerHead.jpg

That's all for the pre-reno pictures and for tonight. Will post the 3D drawings tomorrow.

*Yawn... Going to bed*

 

Share this post


Link to post
Share on other sites

Hello Seng5, which block are you from? From the layout it looks like your unit is a center unit right?

We are from 1B, just started reno 2 days ago. Going to start a blog soon also :)

 

Share this post


Link to post
Share on other sites

wow, 2 P@D blogs set up within a couple of hours from each other? what are the odds..

Welcome to RT! congrats on the new flat and have fun with your reno! :D

 

Share this post


Link to post
Share on other sites
Hello Seng5, which block are you from? From the layout it looks like your unit is a center unit right?

We are from 1B, just started reno 2 days ago. Going to start a blog soon also :)

Hi theanswer, yea we'r the center unit and we from block 1F.

Start your blog soon then we can exchange pointers about reno :P

We just got our 3D design, posting them tonite.

:yamseng:

Seng

Edited by seng55
 

Share this post


Link to post
Share on other sites
wow, 2 P@D blogs set up within a couple of hours from each other? what are the odds..

Welcome to RT! congrats on the new flat and have fun with your reno! :D

Haha really a rare coincidence :)

Anyway I didnt take many photos of my unit before reno start but Seng's unit look the same ;):rolleyes: You guys can refer to these pictures to have an idea of how our place look like

 

Share this post


Link to post
Share on other sites
Hi theanswer, yea we'r the center unit and we from block 1F.

Start your blog soon then we can exchange pointers about reno :P

We just got our 3D design, posting them tonite.

:yamseng:

Seng

Hi neighbour,

Started our blog too. You can check it out at my signature :) I will be going down later today to take some more pictures.

 

Share this post


Link to post
Share on other sites

OpenNet installation work was done up on 23 April. The track went a long way from the foyer to the bomb shelter and round the whole living room and finally ended at the wall where the TV will be placed. Not to worry so much about the long tracks as we will have false ceiling and feature walls to cover them up.

Track Running From Entrance To Foyer Area

OpenNet1.jpg

To Bomb Shelter Area

OpenNet2.jpg

Around the Living Room

OpenNet3.jpg

To The TV Wall Area

OpenNet4.jpg

And Finally OpenNet Installation Done

OpenNet5.jpg

 

Share this post


Link to post
Share on other sites

Hacking and electrical work were completed when we visited the house on 6 May.

Kitchen Wall Hacked

KitchenWallHacked02.jpg

Wall Between MBR & BR2 Hacked

WallBetweenMBRBR2Hacked01.jpg

BR2 Door Dismantled (View From Outside BR2)

BR2DoorDismantledOutside.jpg

BR2 Door Dismantled (View From Inside BR2)

BR2DoorDismantledInside.jpg

MBR Toilet Sink Dismantled

MBRToiletWithSinkDismantled.jpg

To be continued...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×