January 12, 201313 yr Author Main display/storage/shoe cabinet done:* movable boxes which will be placed at the open display shelves.* awaiting installation of black mirror & internal shelvings. Edited January 12, 201313 yr by Rover
January 12, 201313 yr Author Side kitchen cabinet/storage done:Toilet vanity done:* awaiting installation of solid top, sink & mirror. Edited January 12, 201313 yr by Rover
January 12, 201313 yr Author MBR wardrobe:* awaiting installation of doors & joining of study table.Shower glass door installed:MBR door installed:
January 12, 201313 yr Author TV feature wall done:* awaiting black mirror to be installed on the feature wall.
January 12, 201313 yr Author say is easy, to get it done its not. mine is 10ft with 5ft for dining and 5ft for storage. I also find its a bit too small but then cannot make it any bigger or else no space to walk.Of cos onsite measurements are impt too. Also, certain planning gotta wait for other stuffs to be in place before deciding, so dat we can gauge the actual measurements n the practicality onsite.
January 12, 201313 yr Of cos onsite measurements are impt too. Also, certain planning gotta wait for other stuffs to be in place before deciding, so dat we can gauge the actual measurements n the practicality onsite.It's the layout of the flat too. If the length max is 18ft, how can put 15ft then only 3ft for both side. So not measurement that are most important.
January 12, 201313 yr Author It's the layout of the flat too. If the length max is 18ft, how can put 15ft then only 3ft for both side. So not measurement that are most important.Bottom line: work within the space for the freedom thou seek..
January 12, 201313 yr Sigh the only reason mine is 2 piece the staircase and lift going up to my flat is too narrow to accommodate the large single piece... Sigh...
January 13, 201313 yr Author So excited. Final stage of reno liao..Next week will be doing the final touch-up, installations of all the minor works for the carpentry & table tops. After dat final chemical wash & can hand over the hse le.Furnitures delivery will be next weekend. Yet to scout for suitable dining chairs & balcony chairs/table for my cosy/smoking corner tho..Targeted move-in date:Week of 28th Jan Edited January 13, 201313 yr by Rover
January 13, 201313 yr Author Hi, can share where to get the LED downlight and the cost? ThanksDuno wor. Cos I leave it to my ID to settle the lights.
January 13, 201313 yr Author Ordered the following items frm Ikea:Study room chair:Dining chairs:Balcony chairs:Kitchen relax chairs:Extra chairs (foldable):
January 14, 201313 yr Author Anyone got lobang for purchasing of pinball machine? Also, whether need license to own one anot? PM me if not convenient to discuss in public domain
January 14, 201313 yr Study table & wardrobe up:Aircon up:BLUM!!!Hello, did your contractor helped in designing the wardrobe?