The Experience: Our First Home

Featured Replies

Hi HappyAng, my second appointment is on 5 feb. counting down ! Hahaha

Just before CNY. So when u planning to start your renovation?

  • Replies 878
  • Views 306k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Haha no problem. Knowledge is power! Go into your renos prepared! Yeah, the CASE agreement is a bit OTT, but it does what it's supposed to do - protect the consumer Here's what I would insist on at t

  • My two favorite places

  • summersann
    summersann

    Dulux, Gentle Tide, 90GY 63/047. I super liked it too Thank you mishmish! Will load more pictures soon It's a pouf! Something like a stool, but not as hard or structured as one. The shop had many ma

Just before CNY. So when u planning to start your renovation?

Ya really no point collecting key during CNY period coz all workers going back for CNY.

Once everything finalized with ID and FSM on dong tu date, it should be anytime 19/2 onward.

  • Author

summersann, your hacking job completed? I am looking forward to mine this Wed.

The last wall (that took HDB forever to approve) will be hacked tomorrow! Then hacking will be all done. The new hollow-block walls have all been erected and the rooms upstairs have been plastered. The balcony has also been screed smooth. They've already begun tiling the service yard and kitchen, and my subway tiles are already up. Seems like things are going well so far. My designer actually told us on Saturday that if all goes well (she kept stressing IF :D ), we could possibly have our place by end of this month. We were quite stunned. Hahaha. Don't want it to be too fast and rushed though!

Have fun with yours! Remember to post pictures! I love the hacking process :D

The last wall (that took HDB forever to approve) will be hacked tomorrow! Then hacking will be all done. The new hollow-block walls have all been erected and the rooms upstairs have been plastered. The balcony has also been screed smooth. They've already begun tiling the service yard and kitchen, and my subway tiles are already up. Seems like things are going well so far. My designer actually told us on Saturday that if all goes well (she kept stressing IF :D ), we could possibly have our place by end of this month. We were quite stunned. Hahaha. Don't want it to be too fast and rushed though!

Have fun with yours! Remember to post pictures! I love the hacking process :D

Woah ! Can't wait to see the transformation !

  • Author

Oh do u have the design layout of the gate? And the cost? Thanks thanks in advance :)

Not yet! Still waiting for designer to come up with the design. We racked our brains quite a bit over the gate and went to and fro with ideas. Finally chanced upon a gate somewhere while we were lights shopping and the designer said he could do something for us that looked like it. So we're still waiting. If I do get a picture of it/know the cost, I'll share it with you! :)

IMG_0480_zps4683c637.jpg

If im not wrong it might be a Tolix replica but in candy pop colours and wooden bum rest

more of the tolix chairs http://www.tolix.fr/en/products/1-seats/p/11-h-stools

Interesting! Didn't know about the Tolix. I still prefer the one with the wood top :)

Woah ! Can't wait to see the transformation !

Me too! All the best for yours as well! :)

Edited by summersann

Ya really no point collecting key during CNY period coz all workers going back for CNY.

Once everything finalized with ID and FSM on dong tu date, it should be anytime 19/2 onward.

Looking forward to your photo of the renovation. :yamseng:

The last wall (that took HDB forever to approve) will be hacked tomorrow! Then hacking will be all done. The new hollow-block walls have all been erected and the rooms upstairs have been plastered. The balcony has also been screed smooth. They've already begun tiling the service yard and kitchen, and my subway tiles are already up. Seems like things are going well so far. My designer actually told us on Saturday that if all goes well (she kept stressing IF :D ), we could possibly have our place by end of this month. We were quite stunned. Hahaha. Don't want it to be too fast and rushed though!

Have fun with yours! Remember to post pictures! I love the hacking process :D

Congrats for the approval of hacking. Wow! So fast can complete the renovation? If u are doing laminated flooring or parquet, remember to allow the flooring to dry completely before putting the laminate or parquet. Looking forward to see your open concept kitchen and your super big master bedroom. :yamseng:

  • Author

Congrats for the approval of hacking. Wow! So fast can complete the renovation? If u are doing laminated flooring or parquet, remember to allow the flooring to dry completely before putting the laminate or parquet. Looking forward to see your open concept kitchen and your super big master bedroom. :yamseng:

Seems like it would be too fast! :P we're not doing laminated flooring though, and the only parquet flooring we have is on the stairs and some patching up of the ones on the 2nd floor. But I'm just leaving it to the designers and site manager to know when to do what. From the updates my designer gives us, it seems like they're quite on task.

The new master bedroom will be bigger than the usual master, but not super big la :P But I can't wait to see more too! Last hacking supposed to happen today!

Seems like it would be too fast! :P we're not doing laminated flooring though, and the only parquet flooring we have is on the stairs and some patching up of the ones on the 2nd floor. But I'm just leaving it to the designers and site manager to know when to do what. From the updates my designer gives us, it seems like they're quite on task.

The new master bedroom will be bigger than the usual master, but not super big la :P But I can't wait to see more too! Last hacking supposed to happen today!

Will be camping here to see more photos of the transformation. :thumbs up: Good luck! :yamseng:

Love to see the transformation of EM :) more pics PLSSSS hehe

  • Author

Online shopping for the new home!

TTA0307_4_zps15f77852.jpg

Finally got a tin toy :)

TP033_1_zpsea08305e.jpg

A phone for the living room.

forest_green_scissors_lamp_zps1ecb307e.jpg

And finally found the perfect accordion lamp!

Online shopping for the new home!

TTA0307_4_zps15f77852.jpg

Finally got a tin toy :)

TP033_1_zpsea08305e.jpg

A phone for the living room.

forest_green_scissors_lamp_zps1ecb307e.jpg

And finally found the perfect accordion lamp!

Nice buys, where from if I may ask? :sport-smiley-018:

  • Author

Nice buys, where from if I may ask? :sport-smiley-018:

Thanks! The tin toy and the phone are from Kwerkee. The light is from a vintage store :)

  • Author

More pieces for the home!

IMG_0525_zpsd4c261ed.jpg

IMG_0538_zps80dae09b.jpg

IMG_0534_zps20f4160f.jpg(Our standing lamp!)

IMG_0536_zpsa264c702.jpg(Taller cabinet.)

IMG_0537_zps86060c4d.jpg(Bedside table.)

Edited by summersann

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.