June 5, 20179 yr Author Final Handover day has come. The final 10% will be held by me and if there's anything that I would want to touch up these few weeks, E is still gonna come back to touch them up. MUahahaha. Well, all the electrical appliances and furnitures are starting to come in at the same time. 55" Sony Android TV for such a small living room? Me and my wife didn't thought so, cuz at dining table also need to watch! Partition wall to hide all the messy tangling cables. Where's all the wires for the MBR tv and power socket/CAT6 data point? Its just hidden right behind the tv, no partition wall no concealment no nothing, mystery solved.
June 5, 20179 yr Author On 6/1/2017 at 11:22 AM, lynnnie said: Hi, i saw that you install the vento fan. is the wind really powerful? I intend to install too. Please let me know. Thanks it has 3 speeds. Speed 2 is already **** powerful and strong.
June 13, 20179 yr Author Kudos to YJL Renovation Pte Ltd. After being "conned" by Doors Studios and "Ah Hai", I've engaged YJL for the supply and install of my walk-in wardrobe bi-fold door. They have surprised me by their sincerity as well as their promptness in completing my door supply and installation in less than 10 working days. And well, I'm impressed with what I see. Dining table from Ikea (LISABO Series). Bench and chairs are from Comfort Design. Pendant light goes well with the dining set. Ikea sofa (KARLSTAD series)
June 18, 20179 yr Author Just realised all my electronics appliance/products are from Japan. Mitsubishi, Sony, Yamaha, Rinnai, Hitachi just to name a few.
June 19, 20179 yr On 4/20/2017 at 10:20 PM, Prideguy said: Random spot-check today to see if the cons are eating snake. Tiling for washing machine and kitchen sink support half-done. Left with grouting. Living room TV partition wall progress check Aircon box up all done, makes my ceiling looks more cramp but really bo bian... unless don't install aircon, which is impossible in SG!!! Sealed-up existing door for the walk-in wardrobe. can show the pic how the sink sit? Thanks in advances
June 19, 20179 yr Author 6 minutes ago, leeturbo said: can show the pic how the sink sit? Thanks in advances there you go.
June 19, 20179 yr Author Hitachi fridge and wash machine arrived. Kitchen all but completed. MBR toilet also fully completed. Fixed up the bomb-shelter rack as well, which is a MUST before you start moving in because you gonna need all the space to put your bulky items. Rack bought from Qoo10, adjustable legs to accommodate uneven floor level. Edited June 19, 20179 yr by Prideguy
July 3, 20179 yr Love your renovation. Am collecting my key soon. Do you mind sharing your contractor's contact and quote as well ? Thanks.
July 4, 20179 yr Author On 7/3/2017 at 0:43 PM, JennyTan said: Love your renovation. Am collecting my key soon. Do you mind sharing your contractor's contact and quote as well ? Thanks. Pm-ed you.
July 13, 20179 yr Hi lovely house u have done up! Tried to pm u but your inbox is full. Can share with me what's the code for your vinyl flooring? We are using click master too.
July 14, 20179 yr Nicely done up! Could you please share with me the quote? I am collecting this quarter! Thanks in advance
August 12, 20179 yr Hi, can you share the quote for your renovation (overlaying of tiles and kitchen cabinets etc) and the electrician contacts? Thanks!
August 14, 20179 yr So where did you get all your track lights in the end? They look small and nice. From JB tampoi too?
Create an account or sign in to comment