Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Jurong West St 64 Residents - (july 07 Ballot)

Featured Replies

Hi junxian,

so you going to hack your mbr walls? from your 3D drawing, i thought they are building a fake wall beside the bomb shelter... so you do not intend to change the floor tiles and toilet wall tiles? does the price include curtains and aircon?

  • Replies 1.1k
  • Views 205.1k
  • Created
  • Last Reply

Top Posters In This Topic

Hi junxian,

so you going to hack your mbr walls? from your 3D drawing, i thought they are building a fake wall beside the bomb shelter... so you do not intend to change the floor tiles and toilet wall tiles? does the price include curtains and aircon?

yup. hacking the MBR wall to make space for WIW. floor tiles wise.. will re-lay parquet at the WIW area. Toilets .. due to budget constraint and also cant hack/can only overlay ... so never do anything. :sport-smiley-018:

Nope doesn't include curtain / air-con :no:

yup. hacking the MBR wall to make space for WIW. floor tiles wise.. will re-lay parquet at the WIW area. Toilets .. due to budget constraint and also cant hack/can only overlay ... so never do anything. :sport-smiley-018:

Nope doesn't include curtain / air-con :no:

oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

Hey, I go for Hitachi Credit, they should have the lowest interest rates and the procedure is quite straight forward, no hassle. I just go there once and signed the agreement, the whole procedure take less than 15 minutes.

When ur house reno complete almost 80-90%, just call them down to investigate the reno status, they will only release the money to contractor when we are satisfied with the renovation, otherwise they won't release the money.

oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

hi. ya taking bank loan.. as me and wtb kind of just started working not long. 8|

Hey, I go for Hitachi Credit, they should have the lowest interest rates and the procedure is quite straight forward, no hassle. I just go there once and signed the agreement, the whole procedure take less than 15 minutes.

When ur house reno complete almost 80-90%, just call them down to investigate the reno status, they will only release the money to contractor when we are satisfied with the renovation, otherwise they won't release the money.

For fixed rate, hitachi is one of the best, for me.. should be RHB monthly reducing basis.

actually don't look at the interest... just look at how much u paying per month / or the total !

hi all,

just collected my keys...

675A : samluvbliss, toothytooth, apprye

675B : Spotkev, Alexter, greenskyiv, frances02

676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt, thomnjan

676B : crazygirl48, roseberry, shutiao06, popeye gal, ed12, helenteepl, Gemini06, stay

677A : cyanide, bpheng, vin13

677B : shootmie, piggiedearz

677C : inuya5ha, junxian, norah, baby_ayumi

678A : teodami, Commando, bubbletan, jogal, baby_whyme, jjcian

678B : rav3n, GraCieGaL

678C : missyling, adathong, reds79, rafflesjay, payretep

678D : dar80, NiVleK, Flare, JLEO207

wondering if anyone has the same prob with me with regards to the MBR...like not enough space to put wardrobe leh...some of the IDs i spoke to proposed hacking one wall so that the location of the MBR door can be changed...

hi all,

just collected my keys...

675A : samluvbliss, toothytooth, apprye

675B : Spotkev, Alexter, greenskyiv, frances02

676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt, thomnjan

676B : crazygirl48, roseberry, shutiao06, popeye gal, ed12, helenteepl, Gemini06, stay

677A : cyanide, bpheng, vin13

677B : shootmie, piggiedearz

677C : inuya5ha, junxian, norah, baby_ayumi

678A : teodami, Commando, bubbletan, jogal, baby_whyme, jjcian

678B : rav3n, GraCieGaL

678C : missyling, adathong, reds79, rafflesjay, payretep

678D : dar80, NiVleK, Flare, JLEO207

wondering if anyone has the same prob with me with regards to the MBR...like not enough space to put wardrobe leh...some of the IDs i spoke to proposed hacking one wall so that the location of the MBR door can be changed...

Hi , Welcome ! :yamseng:

Is yours corner or corridor unit ? I supposed its corner since corridor unit actually a few ft place for a BIW ?

enjoy your reno process !

What? No free parking on Sunday? Then who dare/want to visit me during weekends especially on Sunday?

****!

ok i heard from 1st Oct, Sunday will be free parking here.

hehehe... just to check will the season parking be cheaper?

i think the town council are looking at erecting the entrance sign very soon too.

ok i heard from 1st Oct, Sunday will be free parking here.

hehehe... just to check will the season parking be cheaper?

i think the town council are looking at erecting the entrance sign very soon too.

why are they erecting?

Oh great to have free parking on sunday. Felt uneasy that it wasn't!

Because most visitors will miss the very obscure entrance to our estate right after turning from the slip road.

hey neighbours

finallly i m opening my door today haha :D

reno should be starting before oct ba.

:paint:

I am happy that they finally opened the divider for the exit BUT, anyone having difficulty using that for turning right? Especially during peak hours. At times, I can wait up to 10 mins because there is no yellow box!!

I am happy that they finally opened the divider for the exit BUT, anyone having difficulty using that for turning right? Especially during peak hours. At times, I can wait up to 10 mins because there is no yellow box!!

ha ha.now then u realised. Rumi has sent out the feedback email to the one incharge on 5 aug. (cos i asked for help too.. )

ha ha.now then u realised. Rumi has sent out the feedback email to the one incharge on 5 aug. (cos i asked for help too.. )

I realised it long ago. But, no time to post or reply to so many PMs.

And, it is really getting on my nerves.

why not just turn left and then u-turn for now. haha. i know it defeats the purpose of that opening. But dunno when they going to paint the yellow box.. maybe we help them paint faster.haha

Anyway i know someone posted this before. after showering at the destinated shower area the water somehow streams into the supposedly dry toilet area.. Is that a defect? If it is , did hdb contractor manage to resolve for u all? If hdb contractor tell u that is like that one, what did you all do to resolve this?

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.