Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Featured Replies

  • Replies 2k
  • Views 452.1k
  • Created
  • Last Reply

Top Posters In This Topic

fyi, uncle must chase chase chase...

if not, he think u can wait one...

but must chase reasonably also ... my house started in august so now, 70% done so far..

left false ceiling n carpentry i think...

Hi Seashell

Thank you so much for your advice. I am grateful for your explanation. I am pretty much going to check each and every tile. Very good advice.

Yes! furniture must not be MDF!

Got to open my eyes BIGGER and do spot check at every stage!

But some things you would know until much later. My home is experiencing tile cracking after 10 years of renovation. The home came with kitchen tiles which are still working fine after living in for 20+years. We extended our kitchen 10 years ago, the new tiles have mostly cracked about 70%. We found out much later that the tiler skipped one step and that's why tiles are cracking. You cannot tell when you spot check...unless you are tiler you know specifically how to should be done.

My sister renovated her HDB flat in 2002. It was with an ID, it was really nice at first. But after living there for 7 years signs of real/lousy workmanship started to show. Her white room doors have cracked and her ceiling paint has started to crack/peel. Her yellow paint job has started to fade. Asked my dad he said the paint job was done badly i.e. the short cut way. You really can't tell until you live in the home long enough. My home paint job was done more than 10 years already but no sign of any cracking or peeling. It looks brand new.

The person doing the work usually likes to cut corners in areas you cannot tell and when no one is looking. So even if after 1 year you cannot tell the defects. Like waterproofing should lasts at least 10 years or forever if done properly not just 1 year or 6 months.

hi vomit

i understand... i cannot tolerate cracked tiles... so far ah soon done my house which i stayed in for 5yrs, no problem... sometimes contractors just to save a little, causes us so much problem later on.... really hate that..

for paint job, some areas u need to have 'sealer'.. my previous house, cus of HDB structure, alot of my neighbours have cracks lines on the wall and dampness... so contractors will tell u to put a layer of sealer before u paint the house.. it usually cost about $200-300 depends on how big is ur house... so sometimes, the building structure also matters...

for paint, easy, specify the brand of paint and be present to see if they are painting... best is, put a layer of sealer...

NJD = No job done :P

HAHA NJD = no job done! Brilliant! Thanks!

I say NSIS= No Soon in Sight! So busy he is!

hi vomit

i think u r likely to vomitblood if u engage ah soon!.. haha... just kidding..

so u got ur contractor yet??

may i ask ah sooners, your wc normally install at which stage.. can it be the last one?

may i ask ah sooners, your wc normally install at which stage.. can it be the last one?

Can be done, let me guess, yr concern is that u r not the first? If yes, removed the cover seat!!!

REMOVE cover seat still can do business wat... haha..

during the hacking process, i told ah soon, some of the items i still want -eg. those stainless steel dishrack from songcho still very new... but duno y ah soon workers very fast, all removed before i can say anything... then ah soon tell the worker to go warehouse retrieve n return me. then i think he is not happy so he PRACTICALLY **** in my WC n pee on the floor and left it over the weekend.. can u imagine when i go up 2 days later, even got mosquito liao... the WC water is BLACK Colour ok..! i m very sure the WC is in good working condition...

i just feel so disgusted by their act. cus not only 1 WC, it's 2 WC also like that.... i really got '****ted' by them ... hahaha...duno will i be considered as unreasonable by installing it last so as to avoid people using it...?

REMOVE cover seat still can do business wat... haha..

during the hacking process, i told ah soon, some of the items i still want -eg. those stainless steel dishrack from songcho still very new... but duno y ah soon workers very fast, all removed before i can say anything... then ah soon tell the worker to go warehouse retrieve n return me. then i think he is not happy so he PRACTICALLY **** in my WC n pee on the floor and left it over the weekend.. can u imagine when i go up 2 days later, even got mosquito liao... the WC water is BLACK Colour ok..! i m very sure the WC is in good working condition...

i just feel so disgusted by their act. cus not only 1 WC, it's 2 WC also like that.... i really got '****ted' by them ... hahaha...duno will i be considered as unreasonable by installing it last so as to avoid people using it...?

Hi seashell ..hey u poor thing. that is really terrible

can request to install later. if not hor what u can is after installing use plastic to wrap up ur toilet bowl and tape it tightly. Heng the workers that come to my place all well behave ones. After I installed mine near the end of carpentry, they did use but they did not dirty nor damage the bowls. I actually wanted my hubby to wrap them with plastic and tape tight tight... but how as usual my hubby take centuries to move his butt... by the time he is ready to wrap it up.. reno complete liao lor..........

REMOVE cover seat still can do business wat... haha..

during the hacking process, i told ah soon, some of the items i still want -eg. those stainless steel dishrack from songcho still very new... but duno y ah soon workers very fast, all removed before i can say anything... then ah soon tell the worker to go warehouse retrieve n return me. then i think he is not happy so he PRACTICALLY **** in my WC n pee on the floor and left it over the weekend.. can u imagine when i go up 2 days later, even got mosquito liao... the WC water is BLACK Colour ok..! i m very sure the WC is in good working condition...

i just feel so disgusted by their act. cus not only 1 WC, it's 2 WC also like that.... i really got '****ted' by them ... hahaha...duno will i be considered as unreasonable by installing it last so as to avoid people using it...?

Haha ya, but if you dont give them one for usage, peeing every where is the standard practise. For me, the common toilet i didnt remove the seat, only the master room. The worker got upset coz lost of additional income for not able to sell yr stuffs.

LADY LUCK is not with me since day 1 when i started reno... imagine my tiling works, 7-8 different people doing different areas at different time...so my requirement i keep on repeat n repeat n repeat .. the workers also very black face i also duno y... alot of sacarstic remarks from them whenever we point out some defects...

yeah now my toilet tiles is not yet completed and they are peeing onto the cement.. i really hope after they lay the tiles, the smell will be gone... ?

just feel very very lousy.. 5 weeks already the tiling work still not finished.... uncle promised 8 Sept HO initially... but now delayed!! I am suffering as all my furniture n stuff are stored in warehouse, my mum's relative from overseas actually arranged to stay in my mum's house (did told him in the begining), because of his delay, i got to pay for their hotel stay... i told uncle already... he promised he will fast fast fast.. how fast i really duno :( :( ...

imagine 8 Sept handover - now tiles 80% completed only, electrical wiring completing soon, still got plastering, painting, piping, carpentry....

LADY LUCK is not with me since day 1 when i started reno... imagine my tiling works, 7-8 different people doing different areas at different time...so my requirement i keep on repeat n repeat n repeat .. the workers also very black face i also duno y... alot of sacarstic remarks from them whenever we point out some defects...

yeah now my toilet tiles is not yet completed and they are peeing onto the cement.. i really hope after they lay the tiles, the smell will be gone... ?

just feel very very lousy.. 5 weeks already the tiling work still not finished.... uncle promised 8 Sept HO initially... but now delayed!! I am suffering as all my furniture n stuff are stored in warehouse, my mum's relative from overseas actually arranged to stay in my mum's house (did told him in the begining), because of his delay, i got to pay for their hotel stay... i told uncle already... he promised he will fast fast fast.. how fast i really duno :( :( ...

imagine 8 Sept handover - now tiles 80% completed only, electrical wiring completing soon, still got plastering, painting, piping, carpentry....

hi seashell

take care...

your hacking finished, elec wriring done, at least these 2 done.... sooon u can move in

nvr know luck might jus turn around & b ur lady fm now on ...

:) fini

LADY LUCK is not with me since day 1 when i started reno... imagine my tiling works, 7-8 different people doing different areas at different time...so my requirement i keep on repeat n repeat n repeat .. the workers also very black face i also duno y... alot of sacarstic remarks from them whenever we point out some defects...

yeah now my toilet tiles is not yet completed and they are peeing onto the cement.. i really hope after they lay the tiles, the smell will be gone... ?

just feel very very lousy.. 5 weeks already the tiling work still not finished.... uncle promised 8 Sept HO initially... but now delayed!! I am suffering as all my furniture n stuff are stored in warehouse, my mum's relative from overseas actually arranged to stay in my mum's house (did told him in the begining), because of his delay, i got to pay for their hotel stay... i told uncle already... he promised he will fast fast fast.. how fast i really duno :( :( ...

imagine 8 Sept handover - now tiles 80% completed only, electrical wiring completing soon, still got plastering, painting, piping, carpentry....

aiyoh.. hope everything will proceed smoothly for you.

but from what i read, delay is the norm for uncle mah so i guess u are not alone.

LADY LUCK is not with me since day 1 when i started reno... imagine my tiling works, 7-8 different people doing different areas at different time...so my requirement i keep on repeat n repeat n repeat .. the workers also very black face i also duno y... alot of sacarstic remarks from them whenever we point out some defects...

yeah now my toilet tiles is not yet completed and they are peeing onto the cement.. i really hope after they lay the tiles, the smell will be gone... ?

just feel very very lousy.. 5 weeks already the tiling work still not finished.... uncle promised 8 Sept HO initially... but now delayed!! I am suffering as all my furniture n stuff are stored in warehouse, my mum's relative from overseas actually arranged to stay in my mum's house (did told him in the begining), because of his delay, i got to pay for their hotel stay... i told uncle already... he promised he will fast fast fast.. how fast i really duno :( :( ...

imagine 8 Sept handover - now tiles 80% completed only, electrical wiring completing soon, still got plastering, painting, piping, carpentry....

bru did u buy kopi o for the tilers or not? must bribe them abit, lolz. Peeing on the cement is ok, no worries.

Hopes everything soon soon li li for you.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.