The Experience: Our First Home

Featured Replies

  • Author

Although I dun agreed with my ID the way they charged us but I think my 4 rooms plus staircase brand new laminate is abt 5K so why not changed new 1 instead of polish here and there, varnish here and patch up there?? I didnt see u mentioned about plastering, izzit included??

Oh we're patching and varnishing because we want to retain the staircase's current railing. It's very vintage, just what we need for the look. Most IDs have informed us that the railing may be damaged if we hack the stairs.

Plastering is already included in the quote under false ceiling works :)

To be fair, with the current quotation, we are doing a lot.

- Hacking 4 walls (at least)

- creating new "alcoves" (1 at the entrance for the shoe area, 1 at the service yard area, 1 in the bedroom upstairs for the enlarged bathroom, 1 in the new master bedroom upstairs for a dry vanity)

- quartz for the kitchen

- a lot of storage ideas, i.e. pull-out drawers, cabinets (kitchen, under stairs, bedrooms, toilets)

- glass panel for new master bedroom wall

- full electrical rewiring, air-con installation, plumbing installation

- wood-deck for balcony, full length powder-coated aluminum framed with glass panel bi-fold doors

Of course, strictly going by numbers, the quote is still high. We need to work on what we can sacrifice to bring the numbers down.

A lot of the items are higher than market rate. That might be the way this firm is getting their "design fee". They didn't charge us a design fee upfront, as compared to the other firms we met who charged us design fees upwards of 3k, but didn't give much ideas that we would expect given the "design fee". If we want to hire them, we can't obsess over each line and must remind ourselves of that point.

That said, constructive suggestions on how to reduce the quotation by opting for other works in place of the current big-ticket ones are very welcomed!! :)

  • Replies 878
  • Views 306k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Haha no problem. Knowledge is power! Go into your renos prepared! Yeah, the CASE agreement is a bit OTT, but it does what it's supposed to do - protect the consumer Here's what I would insist on at t

  • My two favorite places

  • summersann
    summersann

    Dulux, Gentle Tide, 90GY 63/047. I super liked it too Thank you mishmish! Will load more pictures soon It's a pouf! Something like a stool, but not as hard or structured as one. The shop had many ma

Just spend within your own limits.

It's hard to compare line by line for every quotation as end of the day, there's sure some item cheaper and some item expensive all IDs.

I have about 5-6 quotes on hand and funny enough, end of the day I did not choose the cheapest quote among them (78k to 86k).

I choose the 84k ID as somehow I trust in him that he will deliver for me.

His reponsive, experience, attitude and chemistry won us over.

Oh we're patching and varnishing because we want to retain the staircase's current railing. It's very vintage, just what we need for the look. Most IDs have informed us that the railing may be damaged if we hack the stairs.

Plastering is already included in the quote under false ceiling works :)

To be fair, with the current quotation, we are doing a lot.

- Hacking 4 walls (at least)

- creating new "alcoves" (1 at the entrance for the shoe area, 1 at the service yard area, 1 in the bedroom upstairs for the enlarged bathroom, 1 in the new master bedroom upstairs for a dry vanity)

- quartz for the kitchen

- a lot of storage ideas, i.e. pull-out drawers, cabinets (kitchen, under stairs, bedrooms, toilets)

- glass panel for new master bedroom wall

- full electrical rewiring, air-con installation, plumbing installation

- wood-deck for balcony, full length powder-coated aluminum framed with glass panel bi-fold doors

Of course, strictly going by numbers, the quote is still high. We need to work on what we can sacrifice to bring the numbers down.

A lot of the items are higher than market rate. That might be the way this firm is getting their "design fee". They didn't charge us a design fee upfront, as compared to the other firms we met who charged us design fees upwards of 3k, but didn't give much ideas that we would expect given the "design fee". If we want to hire them, we can't obsess over each line and must remind ourselves of that point.

That said, constructive suggestions on how to reduce the quotation by opting for other works in place of the current big-ticket ones are very welcomed!! :)

  • Author

Just spend within your own limits.

It's hard to compare line by line for every quotation as end of the day, there's sure some item cheaper and some item expensive all IDs.

I have about 5-6 quotes on hand and funny enough, end of the day I did not choose the cheapest quote among them (78k to 86k).

I choose the 84k ID as somehow I trust in him that he will deliver for me.

His reponsive, experience, attitude and chemistry won us over.

Same here! We had some quotations that were 40k (which we clearly avoided because the ID clearly has no clue what we meant), and one that was 62k. But that one left out quite a bit of work, so would have amounted to about the same eventually with electrical and what not. It came down to the 86k or the 98k. 86k doesn't include plumbing, aircon installation, electrical rewiring, and was minimal on storage. 98k went all the way with storage, includes electrical, plumbing and installations. We picked the one who inspired us most with their designs and who was willing to scale down the works to meet our budget.

Have you started on your renovation? Hope it goes well!! :)

Edited by summersann

Still waiting for the 3D...will only start work aft cny I guess as key collection predicted end Jan.

Same here! We had some quotations that were 40k (which we clearly avoided because the ID clearly has no clue what we meant), and one that was 62k. But that one left out quite a bit of work, so would have amounted to about the same eventually with electrical and what not. It came down to the 86k or the 98k. 86k doesn't include plumbing, aircon installation, electrical rewiring, and was minimal on storage. 98k went all the way with storage, includes electrical, plumbing and installations. We picked the one who inspired us most with their designs and who was willing to scale down the works to meet our budget.

Have you started on your renovation? Hope it goes well!! :)

I'm going to pitch my tent and follow your blog :yamseng:

  • Author

Still waiting for the 3D...will only start work aft cny I guess as key collection predicted end Jan.

Oh. When was your first appointment? It takes that long eh? :(

  • Author

I'm going to pitch my tent and follow your blog :yamseng:

Haha! Thanks!! :D hope you won't find it too boring. There won't be much action for a while, still waiting for first appt this week, no idea when 2nd appt will be. And the IDs we're probably engaging don't allow the taking home of sketches and plans until after the renovation (copyright issues. Their designs apparently got stolen before) :P

Haha! Thanks!! :D hope you won't find it too boring. There won't be much action for a while, still waiting for first appt this week, no idea when 2nd appt will be. And the IDs we're probably engaging don't allow the taking home of sketches and plans until after the renovation (copyright issues. Their designs apparently got stolen before) :P

All ID same same. They scare u take their drawing and engage contractor instead. Really kanasai

First appointment will be on 24 Nov...still 2 weeks more to go...neck getting long. Haha

Now waiting for ID's 3D and we can get our engine moving on lots of stuffs.

Oh. When was your first appointment? It takes that long eh? :(

  • Author

All ID same same. They scare u take their drawing and engage contractor instead. Really kanasai

Oh really? I thought it was just this firm! Then how do other renotalkers share their 3D drawings on their t-blogs while the renovation is ongoing?

  • Author

First appointment will be on 24 Nov...still 2 weeks more to go...neck getting long. Haha

Now waiting for ID's 3D and we can get our engine moving on lots of stuffs.

Looks like we're going through a similar process. Haha :P

May both our renos go smoothly! :)

Oh really? I thought it was just this firm! Then how do other renotalkers share their 3D drawings on their t-blogs while the renovation is ongoing?

U engage them pay them a deposit. U will get ur 3D. How ever they will only release the drawing when the Reno date is near.

  • Author

U engage them pay them a deposit. U will get ur 3D. How ever they will only release the drawing when the Reno date is near.

Ah... Thanks for explaining to a noob :P

Ah... Thanks for explaining to a noob :P

No problem. Been thru 2 Reno process... Learn lesson thru paying... It will be good to share the experience. How ever this is my personal feedback on IDs

  • Author

Gathering some ideas for the toilets that we decided not to overlay (can't hack because of recent toilet upgrading).

bad.jpg_Thumbnail2.jpg

Our tiles are the same blue.

bad.jpg_Thumbnail2.jpg

Want to keep it clean and simple like in this picture, with minimal built-ins.

Need to find a way to incorporate our shoe/outerwear/bag area into the apartment.

garderob_sov.jpg_Thumbnail2.jpg

This would be ideal.

Trying to figure out what tiles (color-wise) would be best for the first floor.

white.jpg

White?

Unknown.jpg

Darker floor to give the place more character?

:paint:

Edited by summersann

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.