Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
velv

~* Its Our Home

Recommended Posts

Looking for good contractors? Click here for your request

Photos for today purchases

day7mbrwashbasin.jpg

day7tvconsole.jpg

day7coffeetable.jpg

1. What type of finish is applied to the surface of the wood?

The product is sold as unfinished. During the treatment of the wood it is put in a bath which evens out the colours of the different types of pieces that are used and makes it a bit darker, but there is no special finish.

2. What happens when I spill something on the surface, is it stain resistant?

Teakwood is hardwood so the liquid will not go inside but will show on the surface. To avoid stains sweep the whole surface of the furniture equally (not just the area that's been spilled on) with a wet cloth.

3. What guarantee do I have the wood will not expand or split?

It is reclaimed wood. The handmade furniture pieces are a work of art. Crackings can not be avoided and are in fact a characteristic of the piece.

4. How do I care for the furniture?

Try to avoid putting the furniture next to the heating. In the winter time, when the house is heated, please put some water in a cup in the room to enhance the humidity. This is good for the furniture, and for your own health as well.

5. Can the furniture be used outdoors or in a covered patio area?

It's hardwood so it can be used outside, but please be aware that the colour will change to light grey.

Edited by velv
 

Share this post


Link to post
Share on other sites

Day 7 - 29 May 2010

Transport 2nd pile of Sand to site , Living Room wall & Balcony wall prep. Cement screed done up to study room & main entrance passage

Arrival of Tiles too.

Total cost for day work : 200

Accumulated labor cost : 1400

Total cost for raw material : 993.79 + 1 pile of sand + tiles = S$5251.11

Total reno bill as of now :6651.11 + Hacking = S$9301.11

32218_402088947331_658877331_4148548_285

32218_402088932331_658877331_4148545_600

32218_402088937331_658877331_4148546_144

32218_402088942331_658877331_4148547_317

 

Share this post


Link to post
Share on other sites

Day 8 to Day 9 - 30 to 31st May 2010

Transport Tiles, conduct alignment of tiles and specific instructions. Tiling on Living room first

Total cost for day work : 400

Accumulated labor cost : 1800

Total cost for raw material : 993.79 + 1 pile of sand + tiles = S$5251.11

Total reno bill as of now :7051.11 + Hacking = S$9701.11

30018_402561907331_658877331_4164092_487

30018_402561902331_658877331_4164091_317

 

Share this post


Link to post
Share on other sites

Day 10- 01 Jun 2010

Tiling on Living room center , entrance . Alignment for bedrooms

Total cost for day work : 200

Accumulated labor cost : 2000

Total cost for raw material : 993.79 + 1 pile of sand + tiles = S$5251.11

Total reno bill as of now :7251.11 + Hacking = S$9901.11

Window work in progress Day 1

30018_402877767331_658877331_4175216_248

30018_403217032331_658877331_4185053_767

30018_402878882331_658877331_4175272_304

30018_402877772331_658877331_4175217_583

Edited by velv
 

Share this post


Link to post
Share on other sites

Day 11- 02 Jun 2010

Tiling on Living room side, 1 x bedroom center, grinding of wall .

Total cost for day work : 200

Accumulated labor cost : 2200

Total cost for raw material : 993.79 + 1 pile of sand + tiles = S$5251.11

Total reno bill as of now :7451.11 + Hacking = S$10101.11

Window work in progress Day 2

30018_403216972331_658877331_4185049_838

30018_403216982331_658877331_4185050_244

30018_403216987331_658877331_4185051_112

30018_403217007331_658877331_4185052_319

30018_403238102331_658877331_4185389_669

Edited by velv
 

Share this post


Link to post
Share on other sites

Thanks all for your wishes .

There had'nt any T-blog updates for Day 12-13 although we did visit the site daily, so far the living room and bedrooms tiles are coming up. Skids will go in last.

These 2 days I had been tending to my badly damaged mobile which was bought in Dec 2009.

The screen is now suffering serious "internal injuries" and it should be send to the intensive care unit.

It can no longer allow me to accept incoming calls even though I can still make outgoing phone calls.

But it is still going to serve its purposes for the remaining few days of renovation till 13 Jun . . Salute & Hail to my mobile :(

mobilebreak.jpg

Edited by velv
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×