October 23, 201115 yr Author Most likely will start work this thursday ^^Anyway bought the following over weekendFrom Poh JooBasin for common bathroom, plus tall basin mixer 2582 sets of rainshower add-on 467Misc fitting for bathroom 472From song choSteel profiles for kitchen cabinets - 620Kitchen faucet with spray - 400
October 24, 201115 yr Glad to hear that your reno starting this this week....2 more days! hehegood looting on weekend ya ~ "From song choSteel profiles for kitchen cabinets - 620Kitchen faucet with spray - 400"Can i ask something, those cabinet we customize do not comes with cabinet design right?eg. what space saving we need, which compartment to stores kitchen appliances and so on.~~Ohh u bought the kitchen faucet Can share pic for this hehe
October 25, 201115 yr Author Glad to hear that your reno starting this this week....2 more days! hehegood looting on weekend ya ~ "From song choSteel profiles for kitchen cabinets - 620Kitchen faucet with spray - 400"Can i ask something, those cabinet we customize do not comes with cabinet design right?eg. what space saving we need, which compartment to stores kitchen appliances and so on.~~Ohh u bought the kitchen faucet Can share pic for this heheforgot to take pic haha....probably will take another 4 weeks to see it i guess but if i got walk pass i will go take a picture.anyway its similar to last item here. just that got one additional sprayhttp://www.wel-mi.com.sg/products/prodlist.aspx?cateid=80 Edited October 25, 201115 yr by Simontsh
October 26, 201115 yr Author updatetoday went to do some minor prep for reno which is starting on tomorrow (thursday). supposedly aircon guy and tilers will startbought water and paste up some notices hahatml to meet ID to see final 3Ds too Edited October 26, 201115 yr by Simontsh
October 27, 201115 yr haha~~ Did you put up the notice? Guess now they are starting to makeover your unit hehe
October 27, 201115 yr Author haha~~ Did you put up the notice? Guess now they are starting to makeover your unit heheyep notices by me anyway this are the final 3Ds.More or less final.FoyerLivingKitchenMBRNow its time to settle the details like cabinet arrangement etc etc etc Edited October 27, 201115 yr by Simontsh
October 31, 201115 yr Author Updates :went to check the flat over weekend. met ID/carpenter/electrician to discuss on certain items to be done. apparently divider measurement in MBR to be increased after advice by carpenter. vanity in common bathroom to be increased to 3 ft instead of 2ft.anyway aircon guy already settled all trunkings and pipesliving roomconnected through wall to bedroom, this portion should be hidden by wardrobethen this portion should be boxed up with blower mounted here
October 31, 201115 yr Author this is the other room, blower mount above door too. and joint to MBRthis portion is above MBR door. to be boxed up. joins to the common bathroomblower in MBR trunking behind in MBR bathroomwhich is hereall the way to common bathroom as well
October 31, 201115 yr Author and this is the giant trunking in common bathroom as predictedout to aircon ledge
October 31, 201115 yr Author well so we have the common bathroom with giant trunkingmy idea is to use it as a cove light by throwing a LED strip on top haha....dunnno if it will work.this is the water pipe.....hopefully covered by vanity...wun see much of it.I forgot to talk abt my aircon guy.....how could I?!??!so far my honest review : he is not the cheapest. but he doesn't take short cuts. he is a one man show. (he dun believe in delegation) so he will personally do each and every pipe/trunking/drilling etc. see pictures above.speed is considered fast? he started work on 27th Oct morning. 28th evening already send sms saying he finished all the prep work. ask us to let him know when painting of house is completedI dunnid to worry about a thing at all. except for paying lor. anyway he did not collect deposit at all. he say pay when job and everything delivered swee swee.so those who want contact lemme know lor Edited October 31, 201115 yr by Simontsh
October 31, 201115 yr Author tiler also started workfridge base left side cabinet baseright sidewhat do you call this?this is the w/m areaalso did the bathroom shower kerbs....but never take photo cause forgot
October 31, 201115 yr Author purchase updatesalso went to philips carnival over weekend. (bad choice LOL)wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone docki grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where also went to courts...to confirm the colour for the bedframe and headboard. chose december for delivery.... Edited October 31, 201115 yr by Simontsh
November 1, 201115 yr purchase updatesalso went to philips carnival over weekend. (bad choice LOL)wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone docki grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where also went to courts...to confirm the colour for the bedframe and headboard. chose december for delivery....hi~ so your kitchen is still under renovation? does it have soft closing system??
November 1, 201115 yr purchase updatesalso went to philips carnival over weekend. (bad choice LOL)wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone docki grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where Why is it a bad choice if you bought many things? Is it because of the damage on your wallet?
November 1, 201115 yr Author hi~ so your kitchen is still under renovation? does it have soft closing system??yes. kitchen is still under reno. only the bases are being done atm. plus electrical works. the cabinets not yet confirmedWhy is it a bad choice if you bought many things? Is it because of the damage on your wallet? because i think the carnival price is not as good pricing as wad i wanted ma. hahahah