Simontsh

Another Flat At Segar Meadows Hdb 4Rm 93Sqm - Very Very Very Last Minute Reno

Recommended Posts

Most likely will start work this thursday ^^

Anyway bought the following over weekend

From Poh Joo

Basin for common bathroom, plus tall basin mixer 258

2 sets of rainshower add-on 467

Misc fitting for bathroom 472

From song cho

Steel profiles for kitchen cabinets - 620

Kitchen faucet with spray - 400

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Glad to hear that your reno starting this this week....2 more days! hehe

good looting on weekend ya ~

"From song cho

Steel profiles for kitchen cabinets - 620

Kitchen faucet with spray - 400"

Can i ask something, those cabinet we customize do not comes with cabinet design right?

eg. what space saving we need, which compartment to stores kitchen appliances and so on.~~

Ohh u bought the kitchen faucet :sport-smiley-004:

Can share pic for this hehe

 

Share this post


Link to post
Share on other sites

Glad to hear that your reno starting this this week....2 more days! hehe

good looting on weekend ya ~

"From song cho

Steel profiles for kitchen cabinets - 620

Kitchen faucet with spray - 400"

Can i ask something, those cabinet we customize do not comes with cabinet design right?

eg. what space saving we need, which compartment to stores kitchen appliances and so on.~~

Ohh u bought the kitchen faucet :sport-smiley-004:

Can share pic for this hehe

forgot to take pic haha....probably will take another 4 weeks to see it i guess but if i got walk pass i will go take a picture.

anyway its similar to last item here. just that got one additional spray

http://www.wel-mi.com.sg/products/prodlist.aspx?cateid=80

Edited by Simontsh
 

Share this post


Link to post
Share on other sites

update

today went to do some minor prep for reno which is starting on tomorrow (thursday). supposedly aircon guy and tilers will start

bought water and paste up some notices haha

prep3.jpg

prep2.jpg

prep1.jpg

tml to meet ID to see final 3Ds too :sport-smiley-004:

Edited by Simontsh
 

Share this post


Link to post
Share on other sites

haha~~ Did you put up the notice?

Guess now they are starting to makeover your unit hehe

yep notices by me :P

anyway this are the final 3Ds.

More or less final.

Foyer

foyer1.jpg

Living

living1.jpg

Kitchen

kitchen1k.jpg

MBR

mbr1.jpg

Now its time to settle the details like cabinet arrangement etc etc etc :argue:

Edited by Simontsh
 

Share this post


Link to post
Share on other sites

Updates :

went to check the flat over weekend. met ID/carpenter/electrician to discuss on certain items to be done. apparently divider measurement in MBR to be increased after advice by carpenter. vanity in common bathroom to be increased to 3 ft instead of 2ft.

anyway aircon guy already settled all trunkings and pipes

living room

aircon1.jpg

connected through wall to bedroom, this portion should be hidden by wardrobe

aircon2.jpg

then this portion should be boxed up with blower mounted here

aircon3.jpg

 

Share this post


Link to post
Share on other sites

this is the other room, blower mount above door too. and joint to MBR

aircon4.jpg

this portion is above MBR door. to be boxed up. joins to the common bathroom

aircon5.jpg

blower in MBR trunking behind in MBR bathroom

aircon6.jpg

which is here

aircon7.jpg

all the way to common bathroom as well

 

Share this post


Link to post
Share on other sites

well so we have the common bathroom with giant trunking

aircon13.jpg

my idea is to use it as a cove light by throwing a LED strip on top haha....dunnno if it will work.

this is the water pipe.....hopefully covered by vanity...wun see much of it.

aircon14.jpg

I forgot to talk abt my aircon guy.....how could I?!??!

so far my honest review : he is not the cheapest. but he doesn't take short cuts. he is a one man show. (he dun believe in delegation) so he will personally do each and every pipe/trunking/drilling etc. see pictures above.

speed is considered fast? he started work on 27th Oct morning. 28th evening already send sms saying he finished all the prep work. ask us to let him know when painting of house is completed

I dunnid to worry about a thing at all. except for paying lor. :sport-smiley-004: anyway he did not collect deposit at all. he say pay when job and everything delivered swee swee.

so those who want contact lemme know lor :)

Edited by Simontsh
 

Share this post


Link to post
Share on other sites

tiler also started work

fridge base

tiling1.jpg

left side cabinet base

tiling2.jpg

right side

tiling3.jpg

what do you call this?

tiling4.jpg

this is the w/m area

tiling5.jpg

also did the bathroom shower kerbs....but never take photo cause forgot :sport-smiley-004:

 

Share this post


Link to post
Share on other sites

purchase updates

also went to philips carnival over weekend. (bad choice LOL)

wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone dock

i grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where :dunno:

also went to courts...to confirm the colour for the bedframe and headboard. chose december for delivery....

Edited by Simontsh
 

Share this post


Link to post
Share on other sites

purchase updates

also went to philips carnival over weekend. (bad choice LOL)

wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone dock

i grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where :dunno:

also went to courts...to confirm the colour for the bedframe and headboard. chose december for delivery....

hi~ so your kitchen is still under renovation? does it have soft closing system??

 

Share this post


Link to post
Share on other sites

purchase updates

also went to philips carnival over weekend. (bad choice LOL)

wife fast hand fast legs grab the black air fryer, bought rice cooker, vacuum cleaner, one radio/clock and one iphone dock

i grabbed 3 sets of the easy scene. for the remotes. but now have 6 CDL easyscene bulbs thinking to put where :dunno:

Why is it a bad choice if you bought many things? Is it because of the damage on your wallet? :P

 

Share this post


Link to post
Share on other sites

hi~ so your kitchen is still under renovation? does it have soft closing system??

yes. kitchen is still under reno. only the bases are being done atm. plus electrical works. the cabinets not yet confirmed

Why is it a bad choice if you bought many things? Is it because of the damage on your wallet? :P

because i think the carnival price is not as good pricing as wad i wanted ma. hahahah

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×