August 20, 201214 yr Hi allI've just bought a 2.5 storey split-level Inter Terrace and since it's already 20 years old, I would like to renovate the whole house and would like to ask if anyone can help me estimate if my budget of 200k is reasonable :Living/diningMarble flooring (total area est about 800sf)Change powder room toiletChange main wooden doorChange old sliding door to 4 panel glass door with wooden frameKitchenChange of kitchen windowsKitchen cabinets and hardtop (about 4m long)Hack floor/wall tiles (est 250sf floor, 300sf wall)Install ceramic/homogenous floor and wall tilesChange back wall to half concrete/timberChange shower room, extend maid's roomEntertainment roomInstall patio with timber decked floorChange windows to sliding door with locksChange parquet to wood flooring (about 250sf)Master roomChange parquet to wood flooring (about 500sf)Change toiletWalk-in wardrobesChange 2x2panel windows2 bedroomsChange parquet to wood flooring (about 500sf)Walk-in wardrobesStudy tables and shelvesChange 2x2panel windowsChange toilet on 3rd levelChange design of airwellCar PorchChange roof designChange floor tilesKoi pondTimber deckingCar auto gateOthersMaid's room - extendPUB extension to external houseChange old staircase design (3 flights)Electrical wiringElectical pointsPiping with hot water heatersRepainting interior and exterior of houseChange roof Change whole house airconditioning Thank you!
August 21, 201214 yr It is probably more than reasonable. For my terrace, 3rd storey built-in about 2800, I hacked away and redo everything including the tiles, cabinets, electricals and false ceilings. The only things I've kept are wardrobes and parquet (though I will resand and revarnish). I've also spent some money on termite pest control and roof maintenance (including replacing yard roof extension).The above costs me about $100K. Hence for your case, I would say $120-$140K should suffice, unless you are going for really top notch materials. Edited August 21, 201214 yr by Minerat
August 21, 201214 yr It is probably more than reasonable. For my terrace, 3rd storey built-in about 2800, I hacked away and redo everything including the tiles, cabinets, electricals and false ceilings. The only things I've kept are wardrobes and parquet (though I will resand and revarnish). I've also spent some money on termite pest control and roof maintenance (including replacing yard roof extension).The above costs me about $100K. Hence for your case, I would say $120-$140K should suffice, unless you are going for really top notch materials.100k, that is super cheap. Almost impossible in my opinon. I guess you are asking for much less work than TS. Did you change the roof? Staircase? Only change ground floor tiles. No woodwork in bedrooms since you are keeping wardrobes. Toilets? Each toilet probably cost close to 10k if I remember correctly especially if you use good fittings. your reno is probably a mix and match reno as you are keeping quite a few old stuff.I did something similar to the TS which is basically change EVERYTHING. I think the TS is asking for more than what I did as I did not change autogate... my built up is 2500sqft. MAjor items doneWetorks1) redo all flooring, marble for living, ground floor bedroom, tiles for kitchen, backyard, car porch. Timber strip flooring for higher floors. Redo staircase (Expensive).2) change roof tiles3) redo all toilets, homo tiles and waterproofing, new fittings.4) extend backyard roof. Wall tiling for backyard5) change all windows, foyer doors. Glass doors for TV room, master toilet.Cost, $150kCarpentry, electrical1) Eletrica1 with new aircon for all rooms. 2) wardrobes, feature walls.3) new doors4) painting interior and exteriorCost $100kFurniture1) Furniture, 2) bathroom fittings3) lightings4) appliancesCost $50kTotal is $300k.
August 21, 201214 yr Author Thank you all for your responses!I also think 100k is very cheap So I guess 200k thereabouts should be somehow realistic, just need to stretch a little bit more. I intend to also put aside another 30k for furnishing, appliances and lightings, and also considering installing solar for another 25k.Hi Wind30, when did you do your renovation? Is your contractor/ID good? cheers100k, that is super cheap. Almost impossible in my opinon. I guess you are asking for much less work than TS. Did you change the roof? Staircase? Only change ground floor tiles. No woodwork in bedrooms since you are keeping wardrobes. Toilets? Each toilet probably cost close to 10k if I remember correctly especially if you use good fittings. your reno is probably a mix and match reno as you are keeping quite a few old stuff.I did something similar to the TS which is basically change EVERYTHING. I think the TS is asking for more than what I did as I did not change autogate... my built up is 2500sqft. MAjor items doneWetorks1) redo all flooring, marble for living, ground floor bedroom, tiles for kitchen, backyard, car porch. Timber strip flooring for higher floors. Redo staircase (Expensive).2) change roof tiles3) redo all toilets, homo tiles and waterproofing, new fittings.4) extend backyard roof. Wall tiling for backyard5) change all windows, foyer doors. Glass doors for TV room, master toilet.Cost, $150kCarpentry, electrical1) Eletrica1 with new aircon for all rooms. 2) wardrobes, feature walls.3) new doors4) painting interior and exteriorCost $100kFurniture1) Furniture, 2) bathroom fittings3) lightings4) appliancesCost $50kTotal is $300k.
August 21, 201214 yr Hi Minerat,When did you do your house? The quote u got look irressitably attractive. Reno is ongoing. Not sure if quote is cheap but it includes some top notch materials like marble for all toilet vanity tops, caesarstone for kitchen countertops. But I did reuse some stuff like aircons and I didn't do anything to front porch area.
August 22, 201214 yr Author Hi MineratDo you mind pm me your quotation so that I can do some comparison ?Thank you!!Reno is ongoing. Not sure if quote is cheap but it includes some top notch materials like marble for all toilet vanity tops, caesarstone for kitchen countertops. But I did reuse some stuff like aircons and I didn't do anything to front porch area.
August 22, 201214 yr 100k, that is super cheap. Almost impossible in my opinon. I guess you are asking for much less work than TS. Did you change the roof? Staircase? Only change ground floor tiles. No woodwork in bedrooms since you are keeping wardrobes. Toilets? Each toilet probably cost close to 10k if I remember correctly especially if you use good fittings. your reno is probably a mix and match reno as you are keeping quite a few old stuff.I did something similar to the TS which is basically change EVERYTHING. I think the TS is asking for more than what I did as I did not change autogate... my built up is 2500sqft. MAjor items doneWetorks1) redo all flooring, marble for living, ground floor bedroom, tiles for kitchen, backyard, car porch. Timber strip flooring for higher floors. Redo staircase (Expensive).2) change roof tiles3) redo all toilets, homo tiles and waterproofing, new fittings.4) extend backyard roof. Wall tiling for backyard5) change all windows, foyer doors. Glass doors for TV room, master toilet.Cost, $150kCarpentry, electrical1) Eletrica1 with new aircon for all rooms. 2) wardrobes, feature walls.3) new doors4) painting interior and exteriorCost $100kFurniture1) Furniture, 2) bathroom fittings3) lightings4) appliancesCost $50kTotal is $300k.May I know how much it cost you on your electrical plus new aircons? Do you rewire the whole house? One of the quote I got , for aircons alone nearly 26k (6bedrooms with total built up around 3700 in future) the reason being told is exposed trunking in hdb are easier to do and hence cheaper.. But I still think i am being "chopped"
August 22, 201214 yr May I know how much it cost you on your electrical plus new aircons? Do you rewire the whole house? One of the quote I got , for aircons alone nearly 26k (6bedrooms with total built up around 3700 in future) the reason being told is exposed trunking in hdb are easier to do and hence cheaper.. But I still think i am being "chopped"That's like 8 aircons? Sounds high if you ask me. I was given a quotation of about $4.5k for a daikin system3 (other brands should be cheaper) including concealed pipings. To extrapolate, it shoud not be more than $15k for 8 aircons i supposed. You might want to check out gaincity. You can pay $1k deposit and they will send someone down to access installation cost. If you don't want to proceed after that, they will return you the $1k.
August 22, 201214 yr May I know how much it cost you on your electrical plus new aircons? Do you rewire the whole house? One of the quote I got , for aircons alone nearly 26k (6bedrooms with total built up around 3700 in future) the reason being told is exposed trunking in hdb are easier to do and hence cheaper.. But I still think i am being "chopped"I got quoted about 10K for aircons my place - 6 Daikin aircons for a built up of about 2500 sq ft. I think some of the aircons are underpowered (i.e BTU seems a little low) though, so asking the aircon man to do a site survey this weekend to make sure that the aircons are cold enough for the space.
August 22, 201214 yr For a terrace house and if space permits to mount more compressors, you should give some serious thoughts to the aircon configurations. That could save you big time $$$. I like what my previous owner didLevel 1: Both living and dining room are single non-inverter units. These 2 aircons we will hardly on them, hence having non-inverters are cheaper. Level 2: System 3 inverters for 3 bedrooms. Obviously they are more utilized. Level 3. Single split non-inverter for wardrobe room as that is hardly used. Another single unit for the MBR, which I changed to a system2 to accommodate the new study room.
August 23, 201214 yr Thanks minerat and pinkflower for the quote ) though the contractor told me his quote will be the upper bound as he don't like to give us surprises (VO) in future.But it's really good I don't need to pay that much. Minerat, thanks for advising the use of inverter and non-inverter which is very applicable in my case
August 24, 201214 yr 200k seems reasonable, but also depends on quality of materials selected. Is there a need to change the timber floorings ? Can save some cost by re-polish or varnish.Like some forumers suggested, installing non-inverters to liv/din or AC that are seldom used can save you some costs. I did that too. However do note that the refrigerant (or gas) used for non-inverters are slowly being phased out as is it more detrimental to the environment ; so may pose a problem in the future should you need to top up the "gas" .
September 1, 201214 yr Author Thanks all for the replies.I talked to an architect and he told me before adding an additional level, the cost will be around 400-500k for a total move-in condition!! Guess he's out to ketok but also told us we can reduce whatever we don't need (eg certain carpentry...etc). We will have to seek other firm's quotation and make comparison.
September 5, 201214 yr Just came across your t-blog, all the best to your reno. i think it will be good for you to really look around before committing. Some Architect are very expensive. may want to consider having an additional level done by a qualifed architect and the other reno done by a contractor. in that way you may have some savings. check with other forerummers who have done A and A. perhaps you might strike some "gold" along the way. All the best