November 11, 201214 yr Author It's time for some updates..Initially, was thinking of resort/cosy style. After consulting FSM, he proposed black/white/grey aka. modern design. Well, i'm not so resistant to that, hence heeded his advice..Here's some perspective drawings:-View from main entrance - Living Room , well i'm not so like about the tv feature wall.. ID gonna come up with something elseDining area - Wet kitchen on the right..Wet kitchen - Front viewWet Kitchen - Rear viewSimple bathroom
November 11, 201214 yr Author Really nice ! Love the spaciousness !lol, "look" spacious but in actual fact quite confine.. mainly because i have split the kitchen into half... the "study room" is reconstructed back...
November 11, 201214 yr Author More pics..Tiles hacking... completed !Kitchen cabinets.. all gone !Constructing hollow blocks for Study Room
November 11, 201214 yr Author The room is back !!Kitchen wall was down ! That will be the dining area Master bathroom tiling work is completed!
November 12, 201214 yr Author Just finalized the electrical layout..24 double points9 single points27 lighting points6 fan pointsand other misc...points..
November 13, 201214 yr Author Public Holiday = Money spending day...Today stay at home nothing to do. Went to Avalon lighting shops, initially just wanna look see, end up bought some light fixtures..LED downlight 15W with OSRAM driver (3 years warranty) RM160 / S$65.00 <-- i know its expensive. You can opt for "zap mark" ballast at RM120.00. There is also not-so-good LED downlight selling at RM48... huge diff ! But when you compared both side by side, u'll go for the more quality one.. Well, anyway both are made in China...
November 13, 201214 yr Good thing that your bathroom can overlay due to the level difference. Mine is all the same level except the balcony.
November 20, 201213 yr Author Most of the wet works have completed...Floor tiles laid.. @ living hallGeneral view of the wet kitchen...cement based had been erected!ID proposed to have a wash area to wash mops and etc.. which i think is a good idea !
November 20, 201213 yr Author Toilet's shampoo/body gel holder... rust free and ever lasting Edited November 20, 201213 yr by angmoh
November 21, 201213 yr hi angmoh!nice home layout! wanna exchange keys with me? hahaha anyway! congrats on your new awesome crib and have a smooth reno journey ya!love your tiles color looking forward more progress pic from you
November 21, 201213 yr Author Thanks carrotcakegirl.. btw there's a very nice carrotcake stall near my house haha..So far so good on the progress.. Most of the wetworks completed. I think ahead schedule. Next will be wiring and false ceiling... lastly will be carpentry works.. hopefully can be completed before Christmas
Create an account or sign in to comment