Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

How Long Does It Take For 5 Rm Reno?

Featured Replies

Hi,

Would just like to check how long does it take for a new 5 room flat to be renovated?

Also, if you can share how much you spend your flat would be good too!

Many Thanks!

Well this is a tough question.

What theme u want for ur house?

Ask urself what u want to reno ur house?

But to take note that Carpentry and wet work is a killer. So if u want to do a lot of this two u need to set aside quite a lump sum. :dunno:

My 5 room tok abt 5 weeks completion for reno...

I redo my whole kitchen and 2 toilets and a lot of carpentary.

However, I did not hack my marble flooring in the LR and all the

Bedrooms.

Total damage is around 30k including electrical works and excludes furniture.

Materials play a part in the reno cost.

  • Author
My 5 room tok abt 5 weeks completion for reno...

I redo my whole kitchen and 2 toilets and a lot of carpentary.

However, I did not hack my marble flooring in the LR and all the

Bedrooms.

Total damage is around 30k including electrical works and excludes furniture.

Materials play a part in the reno cost.

our budget is only 20K. :)

Theme - aiming for urban resort.

dh had an idea tt he tot may help to save costs that is for the kitchen & living area, he planned to hv cement with tiles as a focus... dunno how to explain. but basically the whole floor wld be cemented. then with some tiles in shapes as focus....

capentary wise - all 3 bedrooms wld need some. esp the mst bedrm.

Kitchen also cant avoid... for the living area. maybe wont do so extravagrant to help save some cost, I guess.

20k - can be done

1) You can cut down on your capentry work in the bedrooms and buy those ready-made furniture.

2) material-wise, only in the lower-range. Not those 4psf kind.

Really depending on you, you can always work around that budget but have to give & take.

i agree with wat raincole said. my budget is somewhere ard this range and we did not do the carpentry work for the other 2 bedrooms. only did the wardrobe for master bedroom and kitchen cabinets for carpentry. no tv console or side drawers. FH and me prefer buying things rather than built in.

all other materials are within normal range. we had to do some hard thinking, compromising and sacrifices on what are the needs and the wants.

all the best shmj ! :rolleyes:

Edited by oonik grl

i think the duration depends on the amt of work you are doing..

i know my id can rush one out within 2 wks for his client as the client had no place to move and old place sold..

hence it also depends on hw you negotiate to fit into the id/contractor schedule..

but coz i told him no rush for mine (i love staying at my parent's place - free minder for son, got maid, free parking, home cook food) and the longer the better so it has been 4 weeks and counting, haha..

my reno including electrical is abt $50K, not including sanitary, appliances or furniture coz i'm doing up the whole place and lots of carpentry, false ceilings in all rooms..

trying hard not to tink about it.. in fact, i tink hdb owns my house and ntuc income owns my renovation! haha..

bills are coming in hard and fast now that i'm into the final stages of renovation..

good luck on yrs!!

Edited by LinDa

  • 2 months later...
i think the duration depends on the amt of work you are doing..

i know my id can rush one out within 2 wks for his client as the client had no place to move and old place sold..

hence it also depends on hw you negotiate to fit into the id/contractor schedule..

but coz i told him no rush for mine (i love staying at my parent's place - free minder for son, got maid, free parking, home cook food) and the longer the better so it has been 4 weeks and counting, haha..

my reno including electrical is abt $50K, not including sanitary, appliances or furniture coz i'm doing up the whole place and lots of carpentry, false ceilings in all rooms..

trying hard not to tink about it.. in fact, i tink hdb owns my house and ntuc income owns my renovation! haha..

bills are coming in hard and fast now that i'm into the final stages of renovation..

good luck on yrs!!

4-6 weeks, or last to 6-months

  • Author
4-6 weeks, or last to 6-months

Thanks folks for the replies!

Reno has started & aiming to finish it in a month.

If all goes well, we will have the hse ready by 4th Aug.

List of stuff that we did:

- Kitchen Cabinets

- Master bedroom wardrobes

- simple feature wall in dining area

- shoe cabinets

- vanity top & glass door in master room toilet.

- shower screen in 2 toilets

- window grilles

- false ceilings in master room & living room

- tiles at foyer

- laminated flooring for rest of the hse

- paints

total damage - $26K. :~

Thanks folks for the replies!

Reno has started & aiming to finish it in a month.

If all goes well, we will have the hse ready by 4th Aug.

List of stuff that we did:

- Kitchen Cabinets

- Master bedroom wardrobes

- simple feature wall in dining area

- shoe cabinets

- vanity top & glass door in master room toilet.

- shower screen in 2 toilets

- window grilles

- false ceilings in master room & living room

- tiles at foyer

- laminated flooring for rest of the hse

- paints

total damage - $26K. :deal:

You may want to leave some $$ for the hob&hood and lightings and electrical cost. If bathroom, then the accessories, plumbing and the heater (instant or storage). Furniture wise can adjust to own budget.

  • Author
You may want to leave some $$ for the hob&hood and lightings and electrical cost. If bathroom, then the accessories, plumbing and the heater (instant or storage). Furniture wise can adjust to own budget.

Thanks for the advise.

Reno is in the final stages liao.

We spend:

- Hob, Hood, heater, toilet accessories: $1.5K

- Frosted Glass door for master room toilet: $580

- Electrical: $1.8K

- Lights: $2K 8|

- Sofa, coffee table, TV console, My little girl's wardrobe, swing, study table: $2K

Total: $7,880.00 :):deal:

spend & spend & spend.... din even realised tt we spend so much liao! :P

Thanks for the advise.

Reno is in the final stages liao.

We spend:

- Hob, Hood, heater, toilet accessories: $1.5K

- Frosted Glass door for master room toilet: $580

- Electrical: $1.8K

- Lights: $2K :furious:

- Sofa, coffee table, TV console, My little girl's wardrobe, swing, study table: $2K

Total: $7,880.00 :):notti:

spend & spend & spend.... din even realised tt we spend so much liao! :furious:

at least on the bright side, its for a good cause...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.