Rebuilding my Semi D

Featured Replies

Hi George/ Snooze

Can share the main con/Architect contacts? and Mr Poon contacts for marble tiles as well, thanks!

  • Replies 141
  • Views 56k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Window panels almost completed, carporch cantilever structure completed. Timber fencing has started. It seems like work progress is getting slower nowadays..haha

  • George Yeo
    George Yeo

    Front view of front wall and car poach where the dumpster is placed. 

  • interesting that your contractor's workers build the brick wall first before erecting a concrete stiffener to tie the brick wall to. my main contractor's workers always cast the concrete stiffeners fi

Posted Images

  • Author
12 minutes ago, Supernova88 said:

Hi George/ Snooze

Can share the main con/Architect contacts? and Mr Poon contacts for marble tiles as well, thanks!

PMed 

On ‎9‎/‎19‎/‎2020 at 10:57 AM, George Yeo said:

@snoozeRon is Poon tenant. What a small world. 

if your marble floor is supposed to be sealed, do check and confirm. mine is supposed to be sealed but it didn't seem or be. initially when water is split onto it, the marble immediately turned darker due to water penetrating into the stone. I did a DIY sealing of the marble and it was a world of difference. marble no longer turned dark after mopping/spilling water.

  • Author

Glass railing at mazzanine installed, timber flooring started as well. It looks like moving in before Christmas is possible now. Cheers 

Screenshot_20201003_214505.jpg

12 hours ago, George Yeo said:

Glass railing at mazzanine installed, timber flooring started as well. It looks like moving in before Christmas is possible now. Cheers 

 

From the looks, 90% to 95% complete by Christmas maybe possible. Move in by then I think highly unlikely. 
You still got carpentry which can only be done after all the flooring and walls are finished since they need to take on site measurements. Not sure how extensive your carpentry work is but fabrication and installation is at least 2 to 3 weeks or more assuming no manpower issues. 

Then also need to do a post con survey and authorities submissions. doing the survey and getting the signed drawings is at least 1 week if fast. Submission to authorities will need for them to look and give comments or approve. PUB takes at least 2 weeks to reply to the submission. 
 

In order to move in, you will need BCA to grant TOP which requires clearance from all other agencies first. So if any agency don’t don’t grant clearance, your QP can’t submit to BCA as well as BCA will reply back to ask for all documents. 

anyway, the “fun” part would be cleaning up the entire house before move in. 

  • Author
2 hours ago, snoozee said:

From the looks, 90% to 95% complete by Christmas maybe possible. Move in by then I think highly unlikely. 
You still got carpentry which can only be done after all the flooring and walls are finished since they need to take on site measurements. Not sure how extensive your carpentry work is but fabrication and installation is at least 2 to 3 weeks or more assuming no manpower issues. 

Then also need to do a post con survey and authorities submissions. doing the survey and getting the signed drawings is at least 1 week if fast. Submission to authorities will need for them to look and give comments or approve. PUB takes at least 2 weeks to reply to the submission. 
 

In order to move in, you will need BCA to grant TOP which requires clearance from all other agencies first. So if any agency don’t don’t grant clearance, your QP can’t submit to BCA as well as BCA will reply back to ask for all documents. 

anyway, the “fun” part would be cleaning up the entire house before move in. 

Yeah, just hope. BTW maincon says possible before Christmas, take it as bonus if TOP before Christmas. 

  • 3 weeks later...

Hello George, thanks for your post. Possible for you to share the contact of your main con / architect as well as the supplier of your tiles please?  Thanks!

  • Author
4 hours ago, Mandm said:

Hello George, thanks for your post. Possible for you to share the contact of your main con / architect as well as the supplier of your tiles please?  Thanks!

PMed 

  • Author

Workers removing scaffolding today. Overall progressing well and hope to have TOP before Christmas. 

Screenshot_20201019_200842.jpg

47 minutes ago, George Yeo said:

Workers removing scaffolding today. Overall progressing well and hope to have TOP before Christmas. 

Screenshot_20201019_200842.jpg

When my QP was booking the date for TOP inspection in late August, the next available date reflected in the BCA TOP/CSC portal was 2 months later meaning late October

Subsequently we managed to change to an earlier date. hope you can get lucky as well when your QP goes in to book

  • Author
9 hours ago, snoozee said:

When my QP was booking the date for TOP inspection in late August, the next available date reflected in the BCA TOP/CSC portal was 2 months later meaning late October

Subsequently we managed to change to an earlier date. hope you can get lucky as well when your QP goes in to book

That's what I heard too. Thanks 

Hi George, Thanks for the post. Can share main con/archi and marble supplier pls. Thanks ! 

  • Author
1 hour ago, joe0123 said:

Hi George, Thanks for the post. Can share main con/archi and marble supplier pls. Thanks ! 

pmed

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.