Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

The Reiki Sanctuary

Featured Replies

  • Author

Often, we wonder how long does it take for a renovation to finish? We feel that our renovation has been dragging too long and there is still no indicative date for a handover. It has now more than 3 months - haha, it is 3 months and 6 days to be exact

All over the house, there are still some works to be completed.

Anyway, sharing here some of the renovation pictures:

Carpentry works in Dining Area. The wardrobe, right of picture, is basically to conceal the aircon trunkings.

DiningWardrobe1-1.jpg

Our new gate:

NewGate1Bforblog.jpg

The Study Area and the kiasu electrical power plugs at study table:

Study-GlassedLowBench1A.jpg

StudyTableSwitches1G.jpg

Edited by Reiki

  • Replies 392
  • Views 126.9k
  • Created
  • Last Reply

Top Posters In This Topic

  • Author

More Pictures

Lightings

The only hanging light in the house is this one in the Dining Area. Once renovation is completed, we will lower down the lights.

DiningLights1.jpg

Led Lights around the house:

- Dining Area at the wall ledges [right and left]. A frosted glass will cover the lights.

Dining-LedgeLights1.jpg

- Under the TV Console in the Living Room

LivingRoom-TVConsoleLights1B.jpg

- At the bed head in Master Bedroom

MBR-BedFrameLights1.jpg

- At the Master Toilet [Works not fully completed here]

MBRToilet-TotoSink1.jpg

  • Author

The Incomplete Kitchen Cabinet

We can't afford a full Blum system. Only using the mechanism for all the drawers and top hung cabinets. Carpenters waiting for the glass framed to install to the drawers and doors. Our kitchen will be black floor, white glass framed drawers and black top.

The Dry Area:

Kitchen-DryArea1C.jpg

The Wet Area:

Kitchen-WetArea1L.jpg

Hopefully, the island hood can be installed this monday.

Edited by Reiki

Did you work out a schedule or timeline with your ID/contractor? Usually the reno permit also states how long the company engaged needs to carry out their work. Sometimes certain companies take on too many jobs and therefore you might need to 'push' then a little harder.

Anyway, your house is shaping up well. Like the LED lights! hee :notti:

Where exactly is your location ah?

  • Author
Did you work out a schedule or timeline with your ID/contractor? Usually the reno permit also states how long the company engaged needs to carry out their work. Sometimes certain companies take on too many jobs and therefore you might need to 'push' then a little harder.

Anyway, your house is shaping up well. Like the LED lights! hee :notti:

Where exactly is your location ah?

The completion date changed few times :bangwall: Initially, we were told early september, then mid september, then early october. Problem is, it is an architect friend handling our project .. it is abit hard to be nasty :(

My place is in Jurong East

Reno Updates:

The Living Room

LivingRoom1.jpg

The Kitchen

- We are still having problem with Franke Island Hood. Seems no personnel can install it :bangwall:

The Wet Area - Kitchen-WetArea1-1.jpg The Dry Area - Kitchen-DryArea1.jpg

The Kingsized Bed Frame

MBR-BedFrame1.jpg

Love the Design Reiki....Like it Bright. Hope I'll be able to post more pictures here once my place is done up too.

Very nice living room and MBR toilet. Looking fwd to see the end product. Sure very nice! :)

Edited by Angel81

  • Author
Love the Design Reiki....Like it Bright. Hope I'll be able to post more pictures here once my place is done up too.

Thanks!

All the best to your reno. I am sure it will be nice. :)

Your suspended tv console is using normal light tube or led lights? :)

We are using led lights. Our designer feels it will give a uniform hotspot throughout which cannot be achieved with a normal light tube.

And led light consumes lower electricity cos of its lower wattage.

Very nice living room and MBR toilet. Looking fwd to see the end product. Sure very nice! :)

Thanks Angel81. Will try to post more pics.

We are busy cleaning up the place the last few days as we will be moving in early next week.

very neat n clean. nice!

Thanks! :)

hi,

nice main gate u have...wats e price like? where u gt it?

It is custom made. Err, not very sure of the price - Designer is yet to invoice us but were told about $850.

  • Author

At last, we managed to solve the problem with the Franke Island Hood. It took few days with few alternatives. The lesson learned - it will be very problematic to install an island hood in old hdb unit if you don't have a good floor-ceiling height.

FrankeIslandHood1A.jpg

Really nice hse u have there after all the reno. Looking forward for ur finalised pics. :) Spam spam...

Wow, led lights also can, save electricity some more, can advise how much it cost for the lights below the tv console? :)

Wah I love your living room...

mm 3 months really very long wor... but i'm glad it does seem to be finishing!

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.