Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Featured Replies

Electrician to check

I also take noted this important piece of information. Thanks :yamseng:

  • Replies 407
  • Views 115.2k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • jumbopanther
    jumbopanther

    On the topic of roof tiles, since it was being brought up, someone asked what would I do? Let me share my thought process how I came to the decision to replace them. For roof tiles, there are few opti

  • Author

Last week, there was a rain, some dampness were observed at the interface between rainwater downpipe and the existing gutter, so contractor quickly rectify. There was a heavy downpour again this afternoon, deliberately went down to site to check the rainwater pipe again as well as other roof + ceiling areas, to make sure there are no signs of leakage, thank goodness, so far no water seepage sign.

Good to check on your house during a heavy rain.

Also personally climb up above the false ceiling to observe, all dry, good. It is important if you have high ceiling, to allow for an access panel (600 x 600) for inspection purpose, otherwise, next time got to cut false ceiling and re-patch back. With an access panel, the false ceiling contractr will install additional aluminium support and do a standard cut-out panel design to easy push up and open, and can put back easily. No damage to ceiling.

journeyphoto671.jpg

When access panel in close position

journeyphoto630.jpg

Edited by jumbopanther

  • Author

Preparing the walls for painting. Scrap off and remove all existing poor paint works, can see the rough surface on the uneven cemented wall

journey090.jpg

For internal walls, do 'putty' to smoothen all the internal walls to prepare for better paint job later(putty walls not for external walls due to not for exposure to rain). A side view to show the 'smoothen' wall

journeyphoto615.jpg

For external walls and columns, do cement plastering with smooth finish (ok to expose to weather)

journeyphoto692.jpg

Wah Jumbo Brother what kind of timeline you give ourself for the transformation? :rolleyes:

  • Author

Wah Jumbo Brother what kind of timeline you give ourself for the transformation? :rolleyes:

6 months including authority inspection. Mine is A&A, not just renovation. So, quite massive lot of works. Anyway, not in hurry to move in.

6 months including authority inspection. Mine is A&A, not just renovation. So, quite massive lot of works. Anyway, not in hurry to move in.

Oh ya...forgot yours is an A&A where you need to PE to come in and BCA approval... :bangwall:

  • Author

Oh ya...forgot yours is an A&A where you need to PE to come in and BCA approval... :bangwall:

Yes, that's right. Have to allow about 1 month + for inspection and TOP.

  • Author

My extended wall abutting the wall of the neighbour, a 'flashing' installed covering the gap between these 2 walls, so that rainwater will not seep in between the 2 walls but flow to the lower side for proper drainage.

My main contractor is quite proper, does not compromise in quality, ensuring all detailed works are done properly and no short-cuts.

journeyphoto677.jpg

My extended wall abutting the wall of the neighbour, a 'flashing' installed covering the gap between these 2 walls, so that rainwater will not seep in between the 2 walls but flow to the lower side for proper drainage.

My main contractor is quite proper, does not compromise in quality, ensuring all detailed works are done properly and no short-cuts.

journeyphoto677.jpg

Hi jumbopanther,

Finally gotten my keys. Can pm me your contacts for electrician and plumber? Thanks in advance. :)

  • Author

Casting of slab for wet kitchen. For the wet kitchen top, with large openings for sink as well as cooking hob, the 2 'bridges' front and back across the slabs are quite thin, approximately 50mm width. So to make it strong and more robust, the contractor proposed and added steel bars within the thin ends and cast the concrete around it. Now it is so strong that one can stand onto it and not break.

journeyphoto530.jpg

  • Author

For my site, this current phase sequence of works:

install equipment inside false ceiling, eg heater > install false ceiling > electrical contractor open holes in false for lighting position > painter do primer/sealer paint 1st coat for all walls and ceiling > installing floor tiles > final 2 coats of finish paint for all walls and ceiling > install light and fan.

Joven horizontal heater (trusted brand)at Level 2 -sharing bewteen common and master toilet.

journeyphoto689.jpg

Another Joven heater at Level 1 toilet, already concealed within the false ceiling, with a 600 x 600 access panel below it for repair or replacement in future.

journeyphoto625.jpg

Hi onion I pm u the carpenter contact already

Got it thanks!! Still sourcing a builder to do my structure works ><

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.