We are almost there, in terms of completing our reno journey.. but few more pending works to go before I can say we are done.

31st Oct our storage lease is coming to an end. We need to move the stuff back in on 31st Oct. So we have asked our ID to complete and handover to us by Thursday.

Still some of the below tasks are yet to be completed:

1. Defective tile fixing at Kitchen

2. Doors Painting and touch-up

3. Lightings - finish all loose ends and complete everything

4. Carpentry - some cabinet door alignments and finishing

5. Cleaning and acid wash

6. Fixing accessories

7. Kompactplus installation.

Hope to get these things sorted out before Thursday.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Hi,

Do you have a picture of the cut pipe? Just did my aircon trunking and have this ugly pipe as well. Wondering what we can do to conceal it too. My ID suggest to build a kerb and run the pipe in the kerb and that sounds like an option too.

Nope. No luck. My ID says it's not advisable. He has advised to keep it.

 

Share this post


Link to post
Share on other sites

I just made a visit to check out the progress. Could see the Electrician, Tiler and Painting working furiously to complete the pending tasks.

I noticed the dining lights have been installed.

">http://gallery_62270_8_46318.jpg

">http://>gallery_62270_8_35917.jpg

 

Share this post


Link to post
Share on other sites

Pictures of bathrooms after solid surface installation.

Common Bath Vanity:

">http://gallery_62270_9_35839.jpg

Master Bathroom Vanity:

">http://>gallery_62270_9_3417.jpg

 

Share this post


Link to post
Share on other sites

Another view of the MBR vanity.

I super like the thin profile of edges created by my ID after my special request.

Many people dislike solid surface because it has thick edges. But my ID educated me that the thick surface is just a front overhang to protect the laminate below. I took the risk of not having the same. Hope it doesn't create long term issues.

">http://gallery_62270_9_8459.jpg

">http://>gallery_62270_9_55777.jpg

 

Share this post


Link to post
Share on other sites

Hectic, hectic, hectic.

Last few days before handover - so many loose ends to tie-up.

Man, this is sucking-up my energy.

Aircon

Lights

Plumber

Carpentry

Painter all at once.. Phew! :(

 

Share this post


Link to post
Share on other sites

Does anybody have a thought on the cleaning of the unit by contractor before handover?

Well, after the cleaning was done last evening, there's more work that happened today. Again the unit is dirty!

My ID says he committed to only one round of cleaning. So I have to wield the broom and mop to clean-up. So much for nothing!

 

Share this post


Link to post
Share on other sites

Does anybody have a thought on the cleaning of the unit by contractor before handover?

Well, after the cleaning was done last evening, there's more work that happened today. Again the unit is dirty!

My ID says he committed to only one round of cleaning. So I have to wield the broom and mop to clean-up. So much for nothing!

They usually do a chemical wash and general cleanup before hand over. Thorough detailed cleanup better to do it ourselves.

 

Share this post


Link to post
Share on other sites

Pictures of bathrooms after solid surface installation.

Common Bath Vanity:

">http://gallery_62270_9_35839.jpg

Master Bathroom Vanity:

">http://gallery_62270_9_3417.jpg

What's the length of your common bath vanity top? Looks very big

 

Share this post


Link to post
Share on other sites

Aluka, congrates, the end is in sight.. lol..

Trust me, u will have to clean non stop till you move in and settle down. The 3 days before i move in, moved in and after move in, i vaccum and mop at least 10 times... :sport-smiley-003:

 
  • Like 1

Share this post


Link to post
Share on other sites

Hi,

I'm going to be your new neighbour! We have just confirmed purchase at the newer flats along Strathmore Ave!

Your reno is looking good!

Welcome to Strathmore. Which blk? Cfm as in Otp oredi?

 

Share this post


Link to post
Share on other sites

Aluka, congrates, the end is in sight.. lol..

Trust me, u will have to clean non stop till you move in and settle down. The 3 days before i move in, moved in and after move in, i vaccum and mop at least 10 times... :sport-smiley-003:

Binzz.. thank you for sharing the fact. We have now completed 3 cleaning sessions. Everytime someone comes in there is more dirt and dust.

Yes, end is in sight. Light at the end of tunnel..

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×