Rebuilding my Semi D

Featured Replies

  • Author

1st time had a good look at my house facade. 

Screenshot_20201020_164936.jpg

Edited by George Yeo
Error

  • Replies 141
  • Views 56.1k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Window panels almost completed, carporch cantilever structure completed. Timber fencing has started. It seems like work progress is getting slower nowadays..haha

  • George Yeo
    George Yeo

    Front view of front wall and car poach where the dumpster is placed. 

  • interesting that your contractor's workers build the brick wall first before erecting a concrete stiffener to tie the brick wall to. my main contractor's workers always cast the concrete stiffeners fi

Posted Images

9 minutes ago, George Yeo said:

1st time had a good look at my house facade. 

Screenshot_20201020_164936.jpg

haha. machiam like unwrapping present like that. you still have your steel carporch roof to be done. I see so many metal plates on your beam. mine similar design but my PE only designed using 3 steel beams so only have 3 plates.

  • Author
9 minutes ago, snoozee said:

haha. machiam like unwrapping present like that. you still have your steel carporch roof to be done. I see so many metal plates on your beam. mine similar design but my PE only designed using 3 steel beams so only have 3 plates.

My PE very kiasu

Hi George... very impressive house! Can share ur contractor contacts pls. Thanks!

  • Author

Window panels almost completed, carporch cantilever structure completed. Timber fencing has started. It seems like work progress is getting slower nowadays..haha

Screenshot_20201028_204148.jpg

  • Author
9 hours ago, aaron909091 said:

Hello george, you house is magnificent! Can share with me your architect and builder? 

Thank, just a simple and modern design that suits my needs. PMed contact 

  • Author

Watertank is done. 

 

Edited by George Yeo

Hi George thanks for sharing your rebuilding journey, can I have the contact for architect and builder as well. Thanks in advance 

  • Author
1 hour ago, Bacteria said:

Hi George thanks for sharing your rebuilding journey, can I have the contact for architect and builder as well. Thanks in advance 

PMessaged. 

  • 2 weeks later...

hihi George, Can you share the contacts of your Architect and main con(builder)? thank you very much for sharing this journey! Many thanks in advance. 

On 9/18/2020 at 10:17 PM, George Yeo said:

 

Hi George,

thank you for sharing your journey! I have just started rebuilding. Could you share the marble tiles contact. You could pm me.


Thanks and congrats!

15 minutes ago, Snowcapper said:

Hi George,

thank you for sharing your journey! I have just started rebuilding. Could you share the marble tiles contact. You could pm me.


Thanks and congrats!

if you had already started work with your builder and if your builder had indicated the supply and install of marble floor for you, you would need to talk to your builder on whether he can omit the item out from the contract should you decide to get from another supplier.

getting building materials from another supplier is not like buying an electrical appliance from another shop. your builder would most likely have factored in the cost of raw materials (marble tiles, tiling adhesive/mix), labour for laying of marble floor/wall, labour for polishing of marble floor/wall into his quotation to you. so by you switching to supply your own materials, your builder would still need to charge you for the labour and materials for install and polishing. on top of that, he could also charge you for profit in attendance. also since you are supplying the materials, if there's any damage during installation and you end up not having enough tiles, you will have to fork out additional money to buy more tiles since you are now the supplier and not the builder.

if you have a very big area for marble installation, supplying your own may save you some money. but do note that this amount can't be part of your construction loan (i'm assuming you have taken construction loan) and needs to be paid in cash to the marble supplier.

anyway, talk to your builder on this and work out the sums should you decide to supply your own marble tiles at this stage when contract had been signed.

  • 2 weeks later...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.